49 C.F.R. § 213.59

Elevation of curved track; runoff.

Last amended: 2017Year: 2026Length: 123 wordsSubsections: 2Official source

Cite as 49 C.F.R. § 213.59 (2026)

(a) If a curve is elevated, the full elevation shall be provided throughout the curve, unless physical conditions do not permit. If elevation runoff occurs in a curve, the actual minimum elevation shall be used in computing the maximum allowable posted timetable operating speed for that curve under § 213.57(b). (b) Elevation runoff shall be at a uniform rate, within the limits of track surface deviation prescribed in § 213.63, and it shall extend at least the full length of the spirals. If physical conditions do not permit a spiral long enough to accommodate the minimum length of runoff, part of the runoff may be on tangent track. [63 FR 34029, June 22, 1998, as amended at 78 FR 16101, Mar. 13, 2013]
Cross-references to the CFR
213.57213.63
49 C.F.R. § 213.59: Elevation of curved track; runoff. | Justis AI