49 C.F.R. § 236.103

Switch circuit controller or point detector.

Last amended: 2017Year: 2026Length: 36 wordsOfficial source

Cite as 49 C.F.R. § 236.103 (2026)

Switch circuit controller, circuit controller, or point detector operated by hand-operated switch or by power-operated or mechanically-operated switch-and-lock movement shall be inspected and tested at least once every three months. [49 FR 3384, Jan. 26, 1984]