49 C.F.R. § 236.382

Switch obstruction test.

Last amended: 2017Year: 2026Length: 46 wordsOfficial source

Cite as 49 C.F.R. § 236.382 (2026)

Switch obstruction test of lock rod of each power-operated switch and lock rod of each hand-operated switch equipped with switch-and-lock-movement shall be made when lock rod is placed in service or changed out, but not less than once each month. [49 FR 3385, Jan. 26, 1984]