49 C.F.R. § 299.607

Pre-revenue service system integration testing.

Last amended: 2020Year: 2026Length: 226 wordsSubsections: 2Official source

Cite as 49 C.F.R. § 299.607 (2026)

(a) Prior to commencing revenue operations, the railroad shall conduct tests of the trainsets throughout the system to— (1) Verify mechanical positioning of the overhead catenary system; and (2) Verify performance of the trainset, track, and signal and trainset control systems. (b) The railroad shall demonstrate safe operation of the system during normal and degraded-mode operating conditions. At a minimum, the following operation tests shall be performed: (1) Slow-speed operation of a trainset; (2) Verification of correct overhead catenary and pantograph interaction; (3) Verification of trainset clearance at structures and passenger platforms; (4) Incremental increase of trainset speed; (5) Performance tests on trainsets to verify braking rates in accordance with § 299.409; (6) Verification of vehicle noise; (7) Verification of correct vehicle suspension characteristics; (8) Vehicle/track system qualification as defined in § 299.609; (9) Load tests with vehicles to verify relay settings and signal and communication system immunization; (10) Monitoring of utility supply circuits and telephone circuits to ensure the adequacy of power supplies, and to verify that transient-related disturbances are within acceptable limits; (11) Verification of vehicle detection due to shunting of signal system circuits; (12) Verification of safe operation of the signal and trainset control system as required by subpart B of this part; (13) Tests of trainset radio reception during system-wide vehicle operation; and (14) Verification of electromagnetic interference/electromagnetic compatibility between various subsystems.
Cross-references to the CFR
299.409299.609