7 C.F.R. § 1924.274
Final inspection.
Cite as 7 C.F.R. § 1924.274 (2026)
Except for emergency repairs, all repair work must be performed in accordance with subpart A of this part. In all cases, Rural Development will make a final inspection of the repair work performed before final payment is made for the work.