7 C.F.R. § 1980.433

Flood or mudslide hazard area precautions.

Last amended: 2016Year: 2026Length: 39 wordsOfficial source

Cite as 7 C.F.R. § 1980.433 (2026)

(See subpart A, § 1980.42.) Administrative The State Director is responsible for determining if a project is located in a special flood or mudslide hazard area. Refer to subpart B of part 1806 of this chapter [RD Instruction 426.2].
Cross-references to the CFR
1980.42.
7 C.F.R. § 1980.433: Flood or mudslide hazard area precautions. | Justis AI