7 C.F.R. § 3430.305
Funding restrictions.
Cite as 7 C.F.R. § 3430.305 (2026)
(a) Construction. Funds made available under this subpart shall not be used for the construction of a new building or facility or the acquisition, expansion, remodeling, or alteration of an existing facility (including site grading and improvement, and architect fees). (b) Indirect costs. Subject to § 3430.54, indirect costs are allowable. However, indirect costs are not allowed on pre- and postdoctoral grants, equipment grants, or conference grants.
- Cross-references to the CFR
- 3430.54