15 C.F.R. § 400.25

Application for subzone designation.

Last amended: 2025Year: 2026Length: 113 wordsSubsections: 4Official source

Cite as 15 C.F.R. § 400.25 (2026)

In addition to the requirements of §§ 400.21(d)(1)(i) and (ii) pertaining to legal authority, § 400.21(d)(2)(vii) pertaining to environmental aspects of the proposal, and § 400.21(d)(3)(i) and (iii) pertaining to operation, a grantee's application for subzone designation shall contain the following information: (a) The name of the operator/user for which subzone designation is sought; (b) The nature of the activity at the proposed subzone; (c) The address(es) and physical size (acreage or square feet) of the proposed subzone location(s); and (d) One or more maps conforming to the requirements of section § 400.21(d)(5)(ii). For any production activity to be conducted at a proposed subzone, the separate requirements of § 400.14(a) must be met.
Cross-references to the CFR
400.14400.21
15 C.F.R. § 400.25: Application for subzone designation. | Justis AI