10 C.F.R. § 63.15

Site characterization.

Last amended: 2017Year: 2026Length: 63 wordsSubsections: 2Official source

Cite as 10 C.F.R. § 63.15 (2026)

(a) DOE shall conduct a program of site characterization with respect to the Yucca Mountain site before it submits an application for a license to be issued under this part. (b) DOE shall conduct the investigations to obtain the required information in a manner that limits adverse effects on the long-term performance of the geologic repository at Yucca Mountain to the extent practical.
10 C.F.R. § 63.15: Site characterization. | Justis AI