23 C.F.R. § 636.208

May I use my existing prequalification procedures with design-build contracts?

Last amended: 2017Year: 2026Length: 24 wordsOfficial source

Cite as 23 C.F.R. § 636.208 (2026)

Yes, you may use your existing prequalification procedures for either construction or engineering design firms as a supplement to the procedures in this part.
23 C.F.R. § 636.208: May I use my existing prequalification procedures with design-build contracts? | Justis AI