24 C.F.R. § 3280.1004

Exterior walls.

Last amended: 2021Year: 2026Length: 49 wordsSubsections: 2Official source

Cite as 24 C.F.R. § 3280.1004 (2026)

(a) The requirements of § 3280.504 for condensation control and vapor retarder installation are required to be provided on each fire separation wall of each attached manufactured home. (b) The requirements of § 3280.506 for heat loss/gain insulation apply to the fire separation wall on each attached manufactured home.
Cross-references to the CFR
3280.5043280.506
24 C.F.R. § 3280.1004: Exterior walls. | Justis AI