12 C.F.R. § 23.11
Lease term.
Cite as 12 C.F.R. § 23.11 (2026)
A CEBA Lease must have an initial term of not less than 90 days. A national bank may acquire property subject to an existing lease with a remaining maturity of less than 90 days if, at its inception, the lease was a conforming lease.