Pub. L. 111-84, div. A, tit. I, subtit. D, sec. 135
REPORT ON E–8C JOINT SURVEILLANCE AND TARGET ATTACK RADAR SYSTEM RE-ENGINING.
SEC. 135. REPORT ON E–8C JOINT SURVEILLANCE AND TARGET ATTACK RADAR SYSTEM RE-ENGINING.(a) In General.—Not later than 90 days after the date of the enactment of this Act, the Secretary of the Air Force shall submit to the congressional defense committees a report on replacing the engines of E-8C Joint Surveillance and Target Attack Radar System aircraft (in this section referred to as “Joint STARS aircraft”). The report shall include the following:(1) An assessment of funding alternatives and options for accelerating funding for the fielding of Joint STARS aircraft with replaced engines.(2) An analysis of the tradeoffs involved in the decision to replace the engines of Joint STARS aircraft or not to replace those engines, including the potential cost savings from replacing those engines and the operational impacts of not replacing those engines.(3) An identification of the optimum path forward for replacing the engines of Joint STARS aircraft and modernizing the Joint STARS fleet.(b) Limitation on Certain Actions.—The Secretary of the Air Force may not take any action that would adversely impact the pace of the execution of the program to replace the engines of Joint STARS aircraft before submitting the report required by subsection (a).123 STAT. 2221