Pub. L. 115-270, tit. III, sec. 3002
QUALIFYING CONDUIT HYDROPOWER FACILITIES.
SEC. 3002. QUALIFYING CONDUIT HYDROPOWER FACILITIES. Section 30(a) of the Federal Power Act (16 U.S.C. 823a(a)) is amended—(1) in paragraph (2)(C), by striking “45 days” and inserting “30 days”; and(2) in paragraph (3)(C)(ii), by striking “5” and inserting “40”.