Pub. L. 116-92, div. C, tit. XXXI, subtit. B, sec. 3116
MODIFICATION TO CERTAIN REQUIREMENTS RELATING TO PLUTONIUM PIT PRODUCTION CAPACITY.
SEC. 3116. MODIFICATION TO CERTAIN REQUIREMENTS RELATING TO PLUTONIUM PIT PRODUCTION CAPACITY.(a) Sense of Congress.—It is the sense of Congress that—(1) rebuilding a robust plutonium pit production infrastructure with a capacity of up to 80 pits per year is critical to maintaining the viability of the nuclear weapons stockpile;(2) that effort will require cooperation from experts across the nuclear security enterprise; and133 STAT. 1952(3) any further delay to achieving a plutonium sustainment capability to support the planned stockpile life extension programs will result in an unacceptable capability gap to our deterrent posture.(b) Modification to Requirements.—Section 4219 of the Atomic Energy Defense Act (50 U.S.C. 2538a) is amended—(1) in subsection (a), by striking paragraph (5) and inserting the following:“(5) during 2030, produces not less than 80 war reserve plutonium pits.”;(2) by striking subsection (b);(3) by redesignating subsections (c) and (d) as subsections (b) and (c), respectively;(4) in subsection (b), as redesignated by paragraph (2), by striking “2027 (or, if the authority under subsection (b) is exercised, 2029)” and inserting “2030”; and(5) in subsection (c), as redesignated by paragraph (2), by striking “subsection (c)” and inserting “subsection (b)”.