Pub. L. 101-510, div. C, tit. XXXI, pt. D, sec. 3151
PRODUCTION OF PLUTONIUM AND HIGHLY ENRICHED URANIUM FOR NUCLEAR WEAPONS AND DISPOSAL OF NUCLEAR STOCKPILES
SEC. 3151. PRODUCTION OF PLUTONIUM AND HIGHLY ENRICHED URANIUM FOR NUCLEAR WEAPONS AND DISPOSAL OF NUCLEAR STOCKPILES (a) Production by the Soviet Union.— Congress urges the President of the Soviet Union and the Supreme Soviet of the Soviet Union— (1) to cease production by the Soviet Union of plutonium; (2) to maintain the cessation in production by the Soviet Union of highly-enriched uranium for weapons that was announced on April 7, 1989. (b) Technical Aspects of Fissile Material Monitoring and Nuclear Warhead Dismantlement.— Should the President determine that future international agreements should provide for dismantlement of nuclear warheads and a ban on further production of fissile materials for weapons, then the Congress urges the President to seek to establish with the Soviet Union a joint technical working group to examine and demonstrate cooperative technical monitoring and inspection arrangements that could be applied to the design and verification of these potential provisions. (c) Report on Verification Techniques.— (1) The President shall prepare a comprehensive technical report on the verification matters described in paragraph (2). (2) The report shall describe the on-site monitoring techniques, inspection arrangements, and national technical means that could be used by the United States to verify the actions of other nations with respect to the following: (A) Dismantlement of nuclear warheads in the event that a future agreement between the United States and the Soviet Union should provide for such dismantlement to be carried out in a mutually verifiable manner. (B) A mutual United States-Soviet ban, leading to a multilateral, global ban, on the production of additional quantities of plutonium and highly-enriched uranium for nuclear weapons. (C) The end use or ultimate disposal of any plutonium and highly enriched uranium recovered from the dismantlement of nuclear warheads. (3) In order to prepare the report required by paragraph (1), the President shall establish a Technical Advisory Committee on Ver-104 STAT. 1840ification of Fissile Material and Nuclear Warhead Controls, to be composed of preeminent government and nongovernment experts in the fields of radiation detection, nondestructive examination, nuclear safeguards, nuclear materials production, and nuclear warhead dismantlement. Such committee, which shall be established not later than December 31, 1990, shall advise the President on the availability, use, and further development of techniques which could be applied to the verification of the prospective actions described in paragraph (2). (4) The report required by paragraph (1) shall be submitted to Congress not later than April 30, 1991. The report shall be submitted in unclassified form with such classified appendices as may be necessary.