Pub. L. 118-159, div. B, tit. XXIV, sec. 2409
EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2022 PROJECTS.
SEC. 2409. EXTENSION OF AUTHORITY TO CARRY OUT CERTAIN FISCAL YEAR 2022 PROJECTS.(a) Extension.—Notwithstanding section 2002 of the Military Construction Authorization Act for Fiscal Year 2022 (division B of Public Law 117–81; 135 Stat. 2161), the authorizations set forth in the table in subsection (b), as provided in sections 2401 and 2402 of that Act (135 Stat. 2173, 2174), shall remain in effect until October 1, 2025, or the date of the enactment of an Act 138 STAT. 2239 authorizing funds for military construction for fiscal year 2026, whichever is later. (b) Table.—The table referred to in subsection (a) is as follows:Defense Agencies and ERCIP Projects: Extension of 2022 Project Authorizations State/CountryInstallation or LocationProjectOriginal Authorized Amount AlabamaFort Novosel10 MW RICE Generator Plant and Microgrid Controls$24,000,000 CaliforniaMarine Corps Air Station MiramarAdditional LFG Power Meter Station$4,054,000 Naval Air Weapons Station China Lake-RidgecrestSolar Energy Storage System$9,120,000 GeorgiaFort Moore4.8 MW Generation and Microgrid$17,593,000 Fort Stewart10 MW Generation Plant, with Microgrid Control$22,000,000 GuamPolaris Point Submarine BaseInner Apra Harbor Resiliency Upgrades Ph 1.$38,300,000 MichiganCamp Grayling650 KW Gas-Fired Micro-Turbine Generation System$5,700,000 MississippiCamp Shelby10 MW Generation Plant an Feeder level Microgrid System$34,500,000 Camp ShelbyElectrical Distribution Infrastructure Undergrounding Hardening Project$11,155,000138 STAT. 2240 New YorkFort DrumWellfield Field Expansion Project$27,000,000 North CarolinaFort Liberty10 MW Microgrid Utilizing Existing and New Generators$19,464,000 Fort LibertyEmergency Water System$7,705,000 OhioSpringfield-Beckley Municipal AirportBase-Wide Microgrid With Natural Gas Generator, Photovoltaic and Battery Storage$4,700,000 Puerto RicoAguadillaMicrogrid Control System, 460 KW PV, 275 KW Generator, 660 Kwh Bess$10,120,000 Fort AllenMicrogrid Control System, 690 KW PV, 275 KW Gen, 570 Kwh Bess$12,190,000 TennesseeMemphis International AirportPV Arrays and Battery Storage$4,780,000 United KingdomRoyal Air Force LakenheathHospital Replacement-Temporary Facilities$19,283,000 VirginiaNational Geospatial-Intelligence Agency Campus EastElectrical System Redundancy$5,299,000 138 STAT. 2241