Pub. L. 119-60, div. C, tit. XXXI, subtit. B, sec. 3116
NOTIFICATION OF COST OVERRUNS FOR CERTAIN DEPARTMENT OF ENERGY PROJECTS.
SEC. 3116. 10 USC 6284.NOTIFICATION OF COST OVERRUNS FOR CERTAIN DEPARTMENT OF ENERGY PROJECTS. Section 4713 of the Atomic Energy Defense Act (50 U.S.C. 2753) is amended—(1) in subsection (a)—(A) in paragraph (1)(A), in the first sentence, by inserting “prior to entry into Phase 6.4 or Phase 4, as appropriate” after “Administration”; and (B) in paragraph (2)(A), by inserting “prior to entry into Phase 6.4” after “project”; (2) in subsection (c)(2)—(A) by redesignating subparagraphs (B) and (C) as subparagraphs (C) and (D), respectively; and (B) by inserting after subparagraph (A) the following new subparagraph (B):139 STAT. 1465 “(B) a review of the revised baseline has been conducted by the Director of Cost Estimating and Program Evaluation of the National Nuclear Security Administration, consistent with section 3221(d)(1)(F) of the National Nuclear Security Administration Act (50 U.S.C. 2411(d)(1)(F)).” ; and (3) in subsection (d)(1), by inserting “and the results of the review conducted by the Director of Cost Estimating and Program Evaluation under subsection (c)(2)(B)” after “subsection (c)(2)”.