Pub. L. 85-500, tit. II, under "housatonic river basin"
housatonic river basin
housatonic river basin The project for the flood control dam and reservoir on Hall Meadow Brook in Torrington and Goshen, Connecticut, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 81, Eighty-fifth Congress, at an estimated cost of $1,960,000. The project for the flood control dam and reservoir on the East Branch of the Naugatuck River in Torrington, Connecticut, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 81, Eighty-fifth Congress, at an estimated cost of $1,780,000.