Pub. L. 86-682, tit. 39, pt. VI, ch. 101, sec. 6414

Procedures after default of bidder or contractor

EnactedYear: 1960Length: 170 wordsOfficial source
§ 6414. Procedures after default of bidder or contractor (a) If an accepted bidder or contractor for the transportation of mail defaults on his bid or contract, the Postmaster General shall contract with the next lowest bidder who will enter into a contract for the service in accordance with his bid, unless he considers the bid too high. If he considers the bid too high, he may contract with any person, giving preference to regular bidders for the service, who will enter into a contract to perform the service at a lower price. (b) The Postmaster General shall require each person contracting under this section to furnish a bond of like tenor, effect, and penalty as that required in the advertisement of the route. Contracts made under this section shall contain the same terms and provisions as those prescribed for similar service. (c) If a satisfactory contract cannot be secured under this section, the Postmaster General may procure temporary service in accordance with section 6412 or 6415 of this title.
Pub. L. 86-682, tit. 39, pt. VI, ch. 101, sec. 6414: Procedures after default of bidder or contractor | Justis AI