Pub. L. 87-874, tit. I, sec. 103

Pub. L. 87-874, tit. I, sec. 103

EnactedYear: 1962Length: 683 wordsOfficial source
Sec. 103. (a) The Act approved August 13, 1946, as amended by the Act approved July 28, 1956 (33 U.S.C. 426e–h), pertaining to shore protection, is hereby further amended as follows: (1) the word “one-third” in section 1(b) is deleted and the word “one-half” is substituted therefor; (2) the following is added after the word “located” in section 1(b): “, except that the costs allocated to the restoration and protection of Federal property shall be borne fully by the Federal Government, and, further, that Federal participation in the cost of a project for restoration and protection of State, county, and other publicly owned shore parks and conservation areas may be, in the discretion of the Chief of Engineers, not more than 70 per centum of the total cost exclusive of land costs, when such areas: Include a zone which excludes permanent human habitation; include but are not limited to recreational beaches; satisfy adequate criteria for conservation and development of the natural resources of the environment; extend landward a sufficient distance to include, where appropriate, protective dunes, bluffs, or other natural features which serve to protect the uplands from damage; and provide essentially full park facilities for appropriate public use, all of which shall meet with the approval of the Chief of Engineers”; (3) the following is added after the word “supplemented” in section 1(e): “, or, in the case of a small project under section 3 of this Act, unless the plan therefor has been approved by the Chief of Engineers”; and (4) sections 2 and 3 are amended to read as follows: “Sec. 2. The Secretary of the Army is hereby authorized to reimburse local interests for work done by them, after initiation of the survey studies which form the basis for the project, on authorized projects which individually do not exceed $1,000,000 in total cost: Provided, That the work which may have been done on the projects is approved by the Chief of Engineers as being in accordance with the authorized projects: Provided further, That such reimbursement shall be subject to appropriations applicable thereto or funds available therefor and shall not take precedence over other pending projects of higher priority for improvements. “Sec. 3. The Secretary of the Army is hereby authorized to undertake construction of small shore and beach restoration and protection projects not specifically authorized by Congress, which otherwise comply with section 1 of this Act, when he finds that such work is advisable, and he is further authorized to allot from any appropriations hereafter made for civil works, not to exceed $3,000,000 for any one fiscal year for the Federal share of the costs of construction of such projects: Provided, That not more than $400,000 shall be allotted for this purpose for any single project and the total amount allotted shall be sufficient to complete the Federal participation in the project under this section including periodic nourishment as provided for under section 1(c) of this Act: Provided further, That the provisions of local cooperation specified in section 1 of this Act shall apply: And provided further, That the work shall be complete in itself and shall not commit the United States to any additional improvement to 76 Stat. 1179insure its successful operation, except for participation in periodic beach nourishment in accordance with section 1(c) of this Act, and as may result from the normal procedure applying to projects authorized after submission of survey reports.” (b) All provisions of existing law relating to surveys of rivers and harbors shall apply to surveys relating to shore protection and section 2 of the River and Harbor Act approved July 3, 1930, as amended (33 Ü.S.C. 426), is modified to the extent inconsistent herewith. (c) The cost-sharing provisions of this Act shall apply in determining the amounts of Federal participation in or payments toward the costs of authorized projects which have not been substantially completed prior to the date of approval of this Act, and the Chief of Engineers, through the Beach Erosion Board, is authorized and directed to recompute the amounts of Federal contribution toward the costs of such projects accordingly.
Pub. L. 87-874, tit. I, sec. 103 | Justis AI