Pub. L. 89-298, tit. III, sec. 301

Pub. L. 89-298, tit. III, sec. 301

EnactedYear: 1965Length: 1,631 wordsOfficial source
Sec. 301. The following works of improvement of rivers and harbors and other waterways for navigation, flood control, and other purposes are hereby adopted and authorized to be prosecuted under the direction of the Secretary of the Army and supervision of the Chief of Engineers, in accordance with the plans and subject to the conditions recommended by the Chief of Engineers in the respective reports hereinafter designated. The provisions of section 1 of the River and Harbor Act approved March 2, 1945 (Public Law Numbered 14, Seventy-ninth Congress, first session), shall govern with respect to projects authorized in this title; and the procedures therein set forth with respect to plans, proposals, or reports for works of improvement for navigation or flood control and for irrigation and purposes incidental thereto, shall apply as if herein set forth in full. navigation Weymouth-Fore and Town Rivers, Boston Harbor, Massachusetts: House Document Numbered 247, Eighty-eighth Congress, at an estimated cost of $12,500,000; Providence River and Harbor, Rhode Island: Senate Document Numbered 93, Eighty-eighth Congress, at an estimated cost of $13,900,000; Rondout Harbor, New York: House Document Numbered 288, Eighty-ninth Congress, at an estimated cost of $20,000; New York and New Jersey Channels-Entrance to Kill Van Kull from Upper New York Bay: House Document Numbered 108, Eighty-ninth Congress, at an estimated cost of $2,581,000; New York Harbor, New York (Anchorage Areas): Senate Document Numbered 17, Eighty-ninth Congress, at an estimated cost of $44,852,000; Shrewsbury River, New Jersey: House Document Numbered 274, Eighty-ninth Congress, at an estimated cost of $4,090,000: Tred Avon River, Talbot. County, Maryland: House Document Numbered 225, Eighty-ninth Congress, at an estimated cost of $323,000;79 Stat. 1090 Potomac and Anacostia Rivers—Removal of Drift in the Washington Metropolitan Area: House Document Numbered 286, Eighty-ninth Congress, maintenance; Channel to Newport News and Norfolk Harbor, Hampton Roads, Virginia; House Document Numbered 143, Eighty-ninth Congress, at an estimated cost of $7,095,000; Channel to Newport News, Norfolk Harbor, and Thimble Shoal Channel, Virginia; House Document Numbered 187, Eighty-ninth Congress, at an estimated cost of $25,600,000; Hampton Creek, Virginia: House Document Numbered 201, Eighty-ninth Congress, modification of items of local cooperation; Cape Fear River, North Carolina: House Document Numbered 252, Eighty-ninth Congress, at an estimated cost of $1,510,000; Savannah Harbor, Georgia: House Documents Numbered 226 and 263, Eighty-ninth Congress, at an estimated cost of $13,569,000. The plan recommended by the Chief of Engineers in House Document Numbered 263, Eighty-ninth Congress, shall include facilities to mitigate damages to presently improved areas southeast of the Savannah Wildlife Refuge at an estimated additional cost of $40,000. The Chief of Engineers may include additional facilities to mitigate damages to additional lands southeast of the Savannah Wildlife Refuge if he determines them to be necessary and justified, at an estimated additional cost of $60,000. All such facilities to mitigate damages shall be maintained by local interests. Jacksonville Harbor, Florida: House Document Numbered 214, Eighty-ninth Congress, at an estimated cost of $8,484,000; Ponce de Leon Inlet, Florida: House Document Numbered 74, Eighty-ninth Congress, at an estimated cost of $1,104,000; Broward County and Hillsboro Inlet, Florida: House Document Numbered 91, Eighty-ninth Congress, at an estimated cost of $1,093,000; East Pass Channel from the Gulf of Mexico into Choctawhatchee Bay, Florida: House Document Numbered 194, Eighty-eighth Congress, at an estimated cost of $1,151,000; Perdido Pass Channel, Alabama: Senate Document Numbered 94, Eighty-eighth Congress, at an estimated cost of $625,000; Bayou La Batre, Alabama: House Document Numbered 327, Eighty-eighth Congress, at an estimated cost of $262,000; Mermentau River, Louisiana: House Document Numbered 239, Eighty-ninth Congress, at an estimated cost of $2,690,000; Alpena Harbor, Michigan; House Document Numbered 151, Eighty-eighth Congress, at an estimated cost of $806,000. In order to compensate for existing low water levels in Lake Huron, an additional increment of one foot in channel depth is hereby authorized; Frankfort Harbor, Michigan: Senate Document Numbered 16, Eighty-ninth Congress, at an estimated cost of $237,000; Lexington Harbor, Michigan: House Document Numbered 301, Eighty-eighth Congress, at an estimated cost of $570,000, except that the modified recommendations of the Chief of Engineers and the Secretary of the Army, contained in letter of April 5, 1965, from the Department of the Army to the Committee on Public Works of the United States Senate, shall apply with respect to recreational fishing facilities on the main breakwater; Saginaw River, Michigan: House Document Numbered 240, Eighty-ninth Congress, at an estimated cost of $437,000; Cedar River Harbor, Michigan: House Document Numbered 248, Eighty-ninth Congress, at an estimated cost of $664,000; Ashtabula Harbor, Ohio: House Document Numbered 269, Eighty-ninth Congress, at an estimated cost of $1,840,000;79 Stat. 1091 Rocky River Harbor, Ohio: House Document Numbered 352, Eighty-eighth Congress, at an estimated cost of $235,000; The project for Lorain Harbor, Ohio, authorized in section 101 of the River and Harbor Act of 1960 (Public Law 86–645; 74 Stat. 480) is hereby modified to authorize the Secretary of the Army, acting through the Chief of Engineers, to construct such bank stabilization works at cut numbered 1 as may be necessary in his discretion to keep the navigation channel in its proper alinement at an estimated additional cost, of $1,600,000. Local interests shall contribute to the cost of the project an amount equal to the value of the land on the date of the original authorization of this project that would have been required for cut numbered 1, but for this modification. West Harbor, Ohio: House Document Numbered 245, Eighty-eighth Congress, at an estimated cost of $544,000; Indiana Harbor, Indiana: House Document Numbered 227, Eighty-ninth Congress, at an estimated cost of $96,000; Burns Waterway Harbor, Indiana: House Document Numbered 160, Eighty-eighth Congress, at an estimated cost of $25,000,000. The Secretary of the Army may reimburse the State of Indiana for the expenditure of funds used to construct such portions of the project as approved by the Chief of Engineers and constructed under the supervision of the Chief of Engineers. Unless construction of the project is initiated within three years from the date of enactment of this Act, the authority to reimburse the State of Indiana contained in this paragraph shall expire. The State of Indiana shall furnish assurance satisfactory to the Secretary of the Army that water and air pollution sources will be controlled to the maximum extent feasible in order to minimize any adverse effects on public recreational areas in the general vicinity of the Harbor. No appropriation is authorized to be made for the construction of this project until the Indiana Dunes National Lakeshore has been voted upon by both Houses of Congress during the same Congress. Chocolate Bayou, Texas: House Document Numbered 217, Eighty-ninth Congress, at an estimated cost of $1,254,000; Houston Ship Channel (Greens Bayou), Texas: House Document Numbered 257, Eighty-ninth Congress, at an estimated cost of $470,000; Trinity River and tributaries, Texas: House Document Numbered 276, Eighty-ninth Congress, including navigation, except that the recommendations of the Board of Engineers for Rivers and Harbors, dated March 14, 1963, shall apply, and there is hereby authorized $83,000,000 for initiation and partial accomplishment of the project. Prior to expenditure of any funds for construction of those features designed exclusively for navigation, the Chief of Engineers shall submit to the Congress a reevaluation based upon current, criteria. San Francisco Bay to Stockton, California: House Document Numbered 208, Eighty-ninth Congress, at an estimated cost of $46,853,000. The works for wave wash protection within the limits of the modified San Joaquin River navigation project shall be repaired or restored by the United States as determined to be necessary by the Secretary of the Army over the life of the project. Crescent City Harbor, California: House Document Numbered 264, Eighty-ninth Congress, at an estimated cost of $1,980,000; Bodega Bay, California: House Document Numbered 106, Eighty-ninth Congress, at an estimated cost of $853,000; Port San Luis, San Luis Obispo Harbor, California: House Document Numbered 148, Eighty-eighth Congress, at an estimated cost of $6,360,000;79 Stat. 1092 Oceanside Harbor, California: House Document Numbered 76, Eighty-ninth Congress, maintenance. The Secretary of the Army is authorized to reimburse local interests for any work done by such interests on such project after August 1, 1965, if he approves such work as being in accordance with the project as otherwise authorized. Port Orford, Oregon: Senate Document Numbered 62, Eighty-eighth Congress, at an estimated cost of $696,000; Chetco River, Oregon: Senate Document Numbered 21, Eighty-ninth Congress, at an estimated cost of $1,308,000; Tillamook Bay and Bar, Oregon: Senate Document Numbered 43, Eighty-ninth Congress, at an estimated cost of $9,000,000; Edmonds Harbor, Washington: House Document Numbered 147, Eighty-eighth Congress, maintenance; Coasts of the Hawaiian Islands, harbors for light-draft vessels, Hawaii: House Document Numbered 353, Eighty-eighth Congress, at an estimated cost of $4,737,000; Honokahau Harbor, Hawaii: House Document Numbered 68, Eighty-ninth Congress, at an estimated cost of $680,000; Honolulu Harbor and Barbers Point Harbor, Oahu, Hawaii: House Document Numbered 93, Eighty-ninth Congress, at an estimated cost of $9,928,000; Kawaihae Harbor, Hawaii: House Document Numbered 75, Eighty-ninth Congress, at an estimated cost of $2,291,000; beach erosion Cliff Walk, Newport, Rhode Island: House Document Numbered 228, Eighty-ninth Congress, at an estimated cost of $340,000; Perth Amboy, New Jersey: House Document Numbered 186, Eighty-ninth Congress, at an estimated cost of $82,000; Atlantic City, New Jersey: House Document Numbered 325, Eighty-eighth Congress, periodic nourishment; Hunting Island Beach, South Carolina: House Document Numbered 323, Eighty-eighth Congress, at an estimated cost of $319,000; Duval County, Florida: House Document Numbered 273, Eighty-ninth Congress, at an estimated cost of $2,266,000; Fort Pierce, Florida: House Document Numbered 84, Eighty-ninth Congress, at an estimated cost of $220,000; Evanston, Illinois: House Document Numbered 159, Eighty-ninth Congress, at an estimated cost of $392,000; Haleiwa Beach, Oahu, Hawaii: House Document Numbered 107, Eighty-ninth Congress, at an estimated cost of $572,000; Waikiki Beach, Hawaii: House Document Numbered 104, Eighty-ninth Congress, at an estimated cost of $2,490,000.
Pub. L. 89-298, tit. III, sec. 301 | Justis AI