Pub. L. 89-298, tit. III, sec. 311
Pub. L. 89-298, tit. III, sec. 311
Sec. 311. The project for Calumet Harbor and River, Illinois and Indiana, as authorized by section 101 of the River and Harbor Act of 1962 (76 Stat. 1173), is modified in order to authorize the Chief of Engineers, at his discretion, under the direction of the Secretary of the Army, to provide at Federal cost (1) such protection for the El gin, Joliet, and Eastern Railway bridge over the Calumet River, Chicago, Illinois, as is necessary to permit dredging of the full width of the south draw to the depth of twenty-seven feet, (2) such temporary protection for the center pier and the south abutment of the New York, Chicago, and Saint Louis Railroad bridge (Nickel Plate) as is necessary to permit dredging of the full width of the south bridge draw to the depth of twenty-seven feet prior to its replacement, and (3) such modification of the channel limits as is necessary to insure full use of each such draw.