Sec. 204. The following works of improvement for the benefit of navigation and the control of destructive flood waters and other purposes are hereby adopted and authorized to be prosecuted under the direction of the Secretary of the Army and the supervision of the Chief of Engineers in accordance with the plans in the respective reports hereinafter designated and subject to the conditions set forth therein. The necessary plans, specifications, and preliminary work may be prosecuted on any project authorized in this title with funds from appropriations hereafter made for flood control so as to be ready for rapid inauguration of a construction program. The projects authorized in this title shall be initiated as expeditiously and prosecuted as vigorously as may be consistent, with budgetary requirements. Penstocks and other similar facilities adapted to possible future use in the development of hydroelectric power shall be installed in any dam authorized in this Act for construction by the Department of the Army when approved by the Secretary of the Army on the recommendation of the Chief of Engineers and the Federal Power Commission. saint john river basin The Dickey-Lincoln School project, Saint John River, Maine, is hereby authorized as approved by the President on July 12, 1965, and substantially in accordance with the plans included in the report of the Department of the Interior and the Corps of Engineers dated August 1964, which is a supplement to the July 1963 report of the International Passamaquoddy tidal power project and upper Saint John River hydroelectric power development, at. an estimated cost of $227,000,000. housatonic river basin The projects for flood protection on the Housatonic, Naugatuck, and Still Rivers at Derby and Danbury, Connecticut, are hereby authorized substantially as recommended by the Chief of Engineers in House Document Numbered 324, Eighty-eighth Congress, at an estimated cost of $5,100,000. 79 Stat. 1075 new england-atlantic coastal area The project for hurricane-flood control protection at Westerly, Rhode Island, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 85, Eighty-ninth Congress, at an estimated cost of $3,287,000. long island sound area The project for hurricane-flood protection at Stratford, Connecticut, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 292, Eighty-eighth Congress, at an estimated cost of $4,340,000. hudson river basin The project for flood protection at Yonkers, Saw Mill River, New York, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 258, Eighty-ninth Congress, at an estimated cost of $1,924,000. new york-atlantic coastal area The project for hurricane-flood protection and beach erosion control at East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, New York, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 215, Eighty-ninth Congress, at an estimated cost of $32,620,000. The project for hurricane-flood protection and beach erosion control at Staten Island, Fort Wadsworth to Arthur Kill, New York, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineer’s in House Document Numbered 181, Eighty-ninth Congress, at an estimated cost of $6,230,000. elizabeth river basin, new jersey The project for hurricane-flood protection on the Elizabeth River, New Jersey, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 249, Eighty-ninth Congress, at an estimated cost of $9,769,000. rahway river basin, new jersey The project, for flood protection on the Rahway River, New Jersey, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 67, Eighty-ninth Congress, at an estimated cost of $1,514,000. neuse river basin The project for the Falls Dam and Reservoir, Neuse River, North Carolina, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers m House Document Numbered 175, Eighty-ninth Congress, at an estimated cost of $18,600,000. The project for hurricane-flood protection at New Bern and Vicinity, North Carolina, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 183, Eighty-ninth Congress, at an estimated cost of $10,400,000. 79 Stat. 1076 middle atlantic coastal area The project for hurricane-flood protection and beach erosion control at Ocracoke Island, North Carolina, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 109, Eighty-ninth Congress, at an estimated cost of $1,636,000. flint river basin The project for the Lazer Creek Reservoir, Flint River, Georgia, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 567, Eighty-seventh Congress, at an estimated cost of $40,378,000. The project for the Lower Auchumpkee Reservoir, Flint River, Georgia, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 567, Eighty-seventh Congress, at an estimated cost of $48,275,000. central and southern florida basin Comprehensive Plan The comprehensive plan for flood control and other purposes in central and southern Florida approved in the Act of June 30, 1948, and subsequent Acts of Congress, is hereby modified to include the following items: The project for flood protection in Hendry County, west of levees 1, 2, and 3, Florida, is hereby authorized substantially as recommended by the Chief of Engineers in House Document Numbered 102, Eighty-eighth Congress, at an estimated cost of $4,986,000. The project for flood protection in southwest Dade County, Florida, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 20, Eighty-ninth Congress, at an estimated cost of $4,903,000. south atlantic coastal area The project for hurricane-flood protection on Biscayne Bay, Florida, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 213, Eighty-ninth Congress, at an estimated cost of $1,954,000. phillippi creek basin, florida The project for flood control on Phillippi Creek, Florida, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 156, Eighty-ninth Congress, at an estimated cost of $4,592,000. lower mississippi river basin Comprehensive Plan The project for flood control and improvement of the lower Mississippi River, adopted by the Act of May 15, 1928 (45 Stat. 534), as amended and modified, is hereby further modified and expanded to include the projects and plans substantially as recommended by the Chief of Engineers in House Documents Numbered 308 and 319, Eighty-eighth Congress, at an estimated cost of $181,109,000, except that (1) any modified easements required in the improvement of the Birds Point-New Madrid, Missouri, Floodway shall be acquired as 79 Stat. 1077provided by section 4 of the Act of May 15, 1928, (2) the pumping plant in the Red River backwater area shall be operated and maintained by the Corps of Engineers, (3) the recommendations of the Bureau of the Budget shall apply with respect to improvements for fish and wildlife, and (4) the requirement of local cooperation for the improvements in the St. Francis Basin, Arkansas and Missouri, shall be reviewed by the Secretary of the Army, acting through the Chief of Engineers, with particular reference to Federal and non-Federal cost sharing, and he shall report results of such review to Congress within one year after the date of enactment of this Act. No appropriation made pursuant to the authorization contained in this paragraph shall be available for any project other than those set forth in House Documents Numbered 308 and 319, Eighty-eighth Congress. The project for the St. Francis River, Missouri and Arkansas, within Drainage District No. 7, Poinsett County, Arkansas, is hereby modified substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 57, Eighty-ninth Congress, at an estimated cost, of $1,372,000. General Projects The project for hurricane-flood protection at Grand Isle and Vicinity, Louisiana, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers, in House Document Numbered 184, Eighty-ninth Congress, at an estimated cost of $5,500,000. The project for hurricane-flood protection at Morgan City and Vicinity, Louisiana, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document. Numbered 167, Eighty-ninth Congress, at an estimated cost of $3,049,000. The project for hurricane-flood protection on Lake Pontchartrain, Louisiana, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 231, Eighty-ninth Congress, except that the recommendations of the Secretary of the Army in that document shall apply with respect to the Seabrook Lock feature of the project. The estimated cost is $56,235,000. ouachita river basin The project for flood protection on the Ouachita River at Monroe, Louisiana, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers, in House Document Numbered 328, Eighty-eighth Congress, at an estimated cost of $520,000. red river basin The project for flood protection on Bayou Bodeau and tributaries, Arkansas and Louisiana, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 203, Eighty-ninth Congress, at an estimated cost of $1,524,000. The project for Caddo Dam and Reservoir, Louisiana, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers, as modified by the Secretary of the Army, in Senate Document Numbered 39, Eighty-ninth Congress, at an estimated cost of $1,934,000. The project for Sanders, Big Pine, and Collier Creeks, Texas, as authorized in the Act of October 23, 1962 (76 Stat. 1187), is hereby 79 Stat. 1078modified in order to provide for a highway crossing Pat Mayse Reservoir to replace the present FM Highway 1499 across Sanders Creek, at an estimated cost of $310,000. Such crossing shall be constructed under the direction of the Secretary of the Army and the supervision of the Chief of Engineers in accordance with such plans as may be recommended by the Chief of Engineers. gulf of mexico The project for flood protection on the Buffalo Bayou and tributaries, White Oak Bayou, Texas, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 169, Eighty-ninth Congress, at an estimated cost of $1,800,000. The project for flood protection on Highland Bayou, Texas, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 168, Eighty-ninth Congress, at an estimated cost of $3,500,000. The project for flood protection on Taylors Bayou, Texas, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers, as mollified by the Secretary of the Army, in House Document Numbered 206, Eighty-ninth Congress, at an estimated cost of $5,004,000. rio grande basin The project, for flood protection on the Rio Grande at. El Paso, Texas, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 207, Eighty-ninth Congress, at an estimated cost of $12,493,000. arkansas river basin Comprehensive Plan The multiple-purpose plan for improvement of Arkansas River and tributaries, authorized by the River and Harbor Act of July 24, 1946, as amended, is hereby modified to authorize the Secretary of the Army acting through the Chief of Engineers, to provide replacement outfall facilities for the Kansas Street outfall sewer in the city of Pine Bluff, Arkansas, including such new pumping facilities as may be necessary, at the most economical Federal expense, but including in the Federal expense the reasonable capitalized cost of operation and maintenance of the pumping facilities over the cost of pumping now required in the existing system. General Projects The project for flood protection on the Arkansas River at Las Animas, Colorado, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 165, Eighty-ninth Congress, at an estimated cost of $1,541,000. The project for flood protection on Lee Creek, Arkansas and Oklahoma, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers m House Document Numbered 270, Eighty-ninth Congress, at an estimated cost of $10,000,000. The project for flood protection at Little Rock, Arkansas, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 55, Eighty-ninth Congress, at an estimated cost of $363,000. 79 Stat. 1079 The project for flood protection on the Arkansas River at Great Bend, Kansas, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 182, Eighty-ninth Congress, at an estimated cost of $4,030,000. The project for establishment of a national wildlife refuge at the John Redmond Dam and Reservoir, Grand (Neosho) River, Kansas, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 27, Eighty-ninth Congress, at an estimated cost of $730,000. The project for flood protection on the Walnut River, Kansas, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 232, Eighty-ninth Congress, at an estimated cost of $66,036,000. The project for the Shidler Dam and Reservoir, Salt Creek, Oklahoma, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 242, Eighty-ninth Congress, at an estimated cost of $6,150,000. The project for flood protection on Crutcho Creek, Oklahoma, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 47, Eighty-ninth Congress, at an estimated cost of $1,801,000. The project for Trinidad Dam on Purgatoire River, Colorado, House Document Numbered 325, Eighty-fourth Congress, authorized by the Flood Control Act of 1958 (72 Stat. 297) is hereby modified to provide that in lieu of the local cooperation recommended in paragraph 2(a) of the report of the Chief of Engineers dated July 22, 1954, published in said document, local interests shall maintain the channel of Purgatoire River through the city of Trinidad. The conditions set forth in paragraphs 2(b) and 2(c) of said report shall be applicable to the project. The John Martin Reservoir project (formerly known as Caddoa Reservoir), Arkansas River, Colorado, as authorized by the Art of June 22, 1936 (49 Stat. 1570), is modified to authorize and direct the Chief of Engineers to use not to exceed ten thousand acre-feet of reservoir flood control storage space for the purpose of establishing and maintaining a permanent pool for fish and wildlife and recreational purposes, at such times as storage space may not be available for such permanent pool within the conservation pool as defined in article III F, Arkansas River compact (63 Stat. 145) except that— (1) The State of Colorado shall purchase and make available any water rights necessary under State law to establish and thereafter maintain the permanent pool. (2) The rights of irrigators in Colorado and Kansas to those waters available to them under the terms of the Arkansas River compact and under the laws of their respective States shall not be diminished or impaired by anything contained in this paragraph. (3) Nothing in this paragraph shall be construed so as to give any preference to the permanent pool over other project purposes. (4) No permanent pool as herein defined shall be maintained except upon written terms and conditions acceptable and agreed to (A) by the Chief of Engineers in the interest of flood control, and (B) by the Colorado State Engineer, the Arkansas River Compact Administration, and the Colorado Water Conservation Board, in the interest of establishing, maintaining, and operating the permanent pool for recreational and fish and wildlife purposes. (5) Nothing in this paragraph shall be construed so as to limit 79 Stat. 1080the authority of the Chief of Engineers to operate John Martin Reservoir for the primary purposes of the prevention of floods and the preservation of life and property. missouri river basin The project for flood protection on Big Creek at Hays, Kansas, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 22, Eighty-ninth Congress, at an estimated cost of $2,702,000. The project for flood protection on the Little Nemaha River and tributaries, Nebraska, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 160, Eighty-ninth Congress, at an estimated cost of $1,524,000. The project for flood protection on the Big Sioux River and tributaries, Iowa and South Dakota, is hereby authorized substantially as recommended by the Chief of Engineers in House Document Numbered 199, Eighty-eighth Congress, at an estimated cost of $6,400,000, except that such portion of the project as relates to the. area above the city limits of Sioux City, Iowa, shall be compatible with a fish and wildlife mitigation plan and also a flood control plan for the upper basin of the Big Sioux River, both to be approved by the States of Iowa and South Dakota. The project for flood protection on the James River and tributaries, North Dakota, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 266, Eighty-ninth Congress, at an estimated cost of $3,083,000. The project for flood control on the Fishing River and tributaries, Missouri, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 281, Eighty-ninth Congress, at an estimated cost of $7,260,000. The project for flood protection on the Chariton and Little Chariton Rivers and tributaries, Iowa and Missouri, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers and the Secretary of the Army in House Document Numbered 238, Eighty-ninth Congress, at an estimated cost of $9,167,000. The project, for flood protection on the Grand River and tributaries, Missouri and Iowa, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document. Numbered 241, Eighty-ninth Congress, at an estimated cost of $218,009,000. Nothing in this Act shall be construed as authorizing the construction of Linneus Reservoir on Locust Creek, St. Catherine Reservoir on East Yellow Creek, the Honey Creek-No Creek local protection works, nor hydroelectric power facilities at Pattonsburg Reservoir on Grand River; the Secretary of the Army shall conduct a review of such reservoirs, local protection works, and hydroelectric power facilities, at an estimated cost of $75,000, and the funds authorized by this paragraph for project planning are authorized to be used for such review. The Secretary shall submit, to Congress, at the earliest practical date, a new feasibility report on such projects based upon such review. The project for flood protection on the Platte River and tributaries, Missouri and Iowa, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 262, Eighty-ninth Congress, at an estimated cost of $26,889,000. 79 Stat. 1081 The project for flood protection on the Sun River at Great Falls, Montana, authorized by section 203 of the Flood Control Act of 1058 (72 Stat. 297; Public Law 85–500) is hereby modified to waive the requirement that local interests contribute in cash 2.16 per centum of the actual construction cost of all items of work provided by the United States. ohio river basin The project for flood protection on Chartiers Creek, Pennsylvania, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 302, Eighty-eighth Congress, at an estimated cost of $12,207,000. The project for flood protection on Sandy Lick Creek at Du Bois, Pennsylvania, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 185, Eighty-ninth Congress, at an estimated cost of $1,654,000. The project for the Hocking River, Ohio, in the vicinity of Athens, Ohio, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 287, Eighty-ninth Congress, at an estimated cost of $4,520,000. The project for the Lincoln, Cliffy Creek, and Patoka Dams and Reservoirs, Wabash River, Indiana and Illinois, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 202, Eighty-ninth Congress, at an estimated cost of $72,900,000. The project for the Lafayette and Big Pine Dams and Reservoirs, Wabash River, Indiana, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineer’s in Senate Document Numbered 29, Eighty-ninth Congress, at an estimated cost of $44,800,000. The project for the Rowlesburg Dam and Reservoir, Cheat River, West Virginia, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 243, Eighty-ninth Congress, at an estimated cost of $133,548,000: Provided, That the power features of this project shall not be undertaken until such time as the Federal Power Commission has completed action on any applications that may be pending before that agency for private development of the pumped-storage facility of the project: Provided further, That should the Federal Power Commission act in the affirmative on any pending applications, the authority for such project shall not include Federal power features and the estimated cost of such project shall be $88,402,000: And provided further, That in the event the Federal Power Commission dismisses any pending applications, Federal construction of such pumped-storage power facilities is hereby authorized and approved. The project for the Martins Fork Reservoir, Upper Cumberland River Basin, Kentucky, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 244, Eighty-ninth Congress, at an estimated cost of $4,860,000. The Yatesville, Paintsville, and Panther Creek Reservoir projects and the Martin, Kentucky, local protection project on the Big Sandy River and Tug and Levisa Forks of Kentucky, West Virginia, and Virginia, are hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 246, Eighty-ninth Congress, at an estimated cost of $51,491,000. Prior to initiation of construction the Secretary of the Army shall prepare an analysis of benefits and costs of the proposed projects, 79 Stat. 1082including such reformulation as may be necessary to comply with the Federal Water Project Recreation Act. red river of the north basin The project for flood protection on the Roseau River, Minnesota, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 282, Eighty-ninth Congress, at an estimated cost of $2,550,000. upper mississippi river basin The project for flood protection at East Saint Louis and vicinity, Illinois (East Side levee and sanitary district), is hereby authorized substantially as recommended by the Chief of Engineers in House Document Numbered 329, Eighty-eighth Congress, at an estimated cost of $6,180,000. The project for the Kaskaskia River, Illinois, authorized by the Flood Control Act of 1958 (Public Law 500, Eighty-fifth Congress), in accordance with the recommendations of the Chief of Engineers in House Document Numbered 232, Eighty-fifth Congress, is hereby modified substantially as recommended by the Chief of Engineers in House Document Numbered 351, Eighty-eighth Congress, to provide for the deletion from the items of local cooperation the requirement of a cash contribution due to changed land use, at an estimated increased Federal cost, of $3,498,000, if local interests make a cash contribution of an amount equal to the full cost of acquisition of flowage easements in those lands which are no longer needed for construction, operation, and maintenance of Carlyle Reservoir. The project for the Wood River Drainage and Levee District, Madison County, Illinois, is hereby authorized substantially as recommended by the Chief of Engineers in House Document Numbered 150, Eighty-eighth Congress, at an estimated cost of $179,000. The project for Ames Dam and Reservoir, Skunk River, Iowa, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers, as modified by the Secretary of the Army, in House Document Numbered 267, Eighty-ninth Congress, at an estimated cost of $12,893,000. The projects for flood protection at Marshalltown and Waterloo on the Iowa and Cedar Rivers, Iowa, are hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 166, Eighty-ninth Congress, at an estimated cost of $17,570,000. The project for the Zumbro River, Minnesota, is hereby authorized substantially as recommended by the Chief of Engineers in House Document Numbered 246, Eighty-eighth Congress, at an estimated cost of $975,000. The project for the Big Stone Lake and Whetstone River, Minnesota and South Dakota, is hereby authorized substantially as recommended by the Chief of Engineers in House Document Numbered 579, Eighty-seventh Congress, and House Document Numbered 193, Eighty-eighth Congress, at an estimated cost of $3,885,000. The project on the Des Moines River for flood protection of Des Moines, Iowa, House Document Numbered 651, Seventy-eighth Congress, authorized by the Act of December 22, 1944 (58 Stat. 887), is hereby modified to eliminate the requirement recommended in paragraph 10(a)(2) of the report of the Chief of Engineers dated December 13, 1943, that local interests bear the expense of repairs and provision of gates on existing drains. 79 Stat. 1083 great lakes basin The project for flood control and navigation on the Chagrin River, Ohio, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 35, Eighty-ninth Congress, at an estimated cost of $2,200,000. The project for flood protection on the Grand River at and in the vicinity of Grandville, Michigan, is hereby authorized substantially in accordance, with the recommendations of the Chief of Engineers in House Document Numbered 157, Eighty-eighth Congress, at an estimated cost of $1,373,000. little colorado river basin The project for flood protection on the Little Colorado River at and in the vicinity of Winslow, Arizona, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 63, Eighty-eighth Congress, at an estimated cost of $2,775,000. gila river basin The project for flood protection on Indian Bend Wash, Maricopa County, Arizona, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 303, Eighty-eighth Congress, at an estimated cost of $7,250,000. The project, for flood protection on the Santa Rosa Wash, Arizona, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 189, Eighty-ninth Congress, at an estimated cost of $6,430,000, except that the development of recreation and fish and wildlife facilities shall be in accordance with the Federal Water Project Recreation Act. The project for flood protection at Phoenix, Arizona, and vicinity, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 216, Eighty-ninth Congress, at an estimated cost of $58,310,000. eel river basin The project for flood protection on the Eel River, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 234, Eighty-ninth Congress, at an estimated cost of $13,732,000. sacramento river basin The project for the New Bullards Bar Dam and Reservoir, Yuba River, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 180, Eighty-ninth Congress, at an estimated cost of $8,979,000. The project for the Lakeport Dam and Reservoir with supplemental channel improvements, Scotts Creek, Cache Creek Basin, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document. Numbered 259, Eighty-ninth. Congress, at an estimated cost of $9,360,000. 79 Stat. 1084 san francisco bat area The project for flood protection on Sonoma Creek, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House. Document Numbered 224, Eighty-ninth Congress, at an estimated cost, of $9,400,000. The project for the Napa River, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 222, Eighty-ninth Congress, at an estimated cost of $14,950,000. whitewater river basin The project for flood protection on Tahquitz Creek, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 223, Eighty-ninth Congress, except that the amount of local contribution required due to enhancement of land shall be reduced by the amount of contribution determined on lands under Indian ownership at the time of project authorization and not subject to taxation due to Federal statutory restrictions. The amount of contribution on this basis is presently estimated at $508,000. The estimated cost is $3,442,000. santa ana river basin The project for flood protection on Lytle and Warm Creeks, San Bernardino County, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 53, Eighty-ninth Congress, at an estimated cost of $9,750,000. san diego river basin The project for flood protection on San Diego River (Mission Valley), California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 212, Eighty-ninth Congress, at an estimated cost of $14,600,000, except that the Secretary of the Army may reimburse local interests for the expenditure of funds used to construct such portions of the project as approved by the Chief of Engineers and constructed under the supervision of the Chief of Engineers. columbia river basin The projects for the Lower Grande Ronde and Catherine Creek dams and reservoirs, Grande Ronde River and tributaries, Oregon, are hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 280, Eighty-ninth Congress, at an estimated cost of $20,440,000. The Chief of Engineers shall construct, operate, and maintain such projects. The project for flood protection on Willow Creek, Oregon, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 233, Eighty-ninth Congress, at an estimated cost of $6,680,000. The project for acquisition of additional lands for waterfowl management at John Day Lock and Dam, Oregon and Washington, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 28, 79 Stat. 1085Eighty-ninth Congress, at an estimated cost of $706,000, except that the parcels of land, in Oregon, between the Columbia River and the management area boundary within sections 3, 4, 10, and 11 of Township 4 North, Range 25 East, Willamette Meridian, as shown on plate 1 of Senate Document Numbered 28, Eighty-ninth Congress, estimated at 611.02 acres, shall not be part of the management area, and the Secretary of the Army is authorized to purchase such additional lands in sections 22, 27, 29, and 30, Township 5 North, Range 26 East, Willamette Meridian, outside the present indicated management area boundary on plate 1, as he determines necessary to replace the lands so excluded.
Pub. L. 89-298, tit. II, sec. 204 | Justis AI