Pub. L. 89-789, tit. II, sec. 203
Pub. L. 89-789, tit. II, sec. 203
Sec. 203. The following works of improvement for the benefit of navigation and the control of destructive floodwaters and other purposes are hereby adopted and authorized to be prosecuted under the direction of the Secretary of the Army and the supervision of the Chief of Engineers in accordance with the plans in the respective reports hereinafter designated and subject to the conditions set forth therein. The necessary plans, specifications, and preliminary work may be prosecuted on any project authorized in this title with funds from appropriations hereafter made for flood control so as to be ready for rapid inauguration of a construction program. The projects authorized in this title shall be initiated as expeditiously and prosecuted as vigorously as may be consistent with budgetary requirements. Penstocks and similar facilities adapted to possible future use in the development of hydroelectric power shall be installed in any dam authorized in this Act for construction by the Department of the Army when approved by the Secretary of the Army on the recommendation of the Chief of Engineers and the Federal Power Commission. merrimack river basin The project for North Nashua River, Massachusetts, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 113, Eighty-ninth Congress, at an estimated cost of $15,816,000. The project for flood protection on the Sudbury River at Saxonville, Massachusetts, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 61, Eighty-ninth Congress, at an estimated cost of $1,300,000. long island sound The project for flood protection on the Pequonnock River, Connecticut, is hereby authorized substantially as recommended by the Chief of Engineers in Senate Document Numbered 115, Eighty-ninth Congress, at an estimated cost of $5,000,000. middle atlantic coastal area The project for hurricane-flood control protection at Beaufort Inlet to Bogue Inlet, North Carolina, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 479, Eighty-ninth Congress, at an estimated cost of $320,000. The project for hurricane-flood control protection at Bogue Inlet to Moore Inlet, North Carolina, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 480, Eighty-ninth Congress, at an estimated cost of $1,249,000. The project for hurricane-flood control protection from Cape Fear to the North Carolina-South Carolina State line, North Carolina, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 511, Eighty-ninth Congress, at an estimated cost of $12,310,000. The project for hurricane-flood control protection for Mainland Areas, North Carolina, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House 80 Stat. 1420Document Numbered 475, Eighty-ninth Congress, at an estimated cost of $2,048,000. The project for hurricane-flood control protection for the Outer Banks—Virginia State line to Hatteras, North Carolina, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 476, Eighty-ninth Congress, at an estimated cost of $6,652,000. savannah river basin The project for construction of the Trotters Shoals Reservoir on the Savannah River, Georgia and South Carolina, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 52, Eighty-ninth Congress, at an estimated cost of $84,900,000. Nothing in this Act shall be construed to authorize inclusion of pumped storage power in this project. lower mississippi river basin The project for flood control and improvement of the lower Mississippi River, adopted by the Act of May 15, 1928 (45 Stat. 534) as amended and modified by subsequent Acts of Congress, including the Flood Control Act of 1965 (Public Law 89–298), is hereby further modified and expanded to include the following items: (1) The project for flood protection in the Teche-Vermilion Basins, Louisiana, substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 524, Eighty-ninth Congress, at an estimated cost of $5,100,000. (2) Bank revetment for the protection of existing industrial facilities along the river below Baton Rouge, Louisiana, where, in the discretion of the Chief of Engineers, such bank protection is justified. arkansas and red rivers The project for water quality control in the Arkansas and Red River Basin, Texas, Oklahoma, and Kansas, designated as Part I is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 110, Eighty-ninth Congress, at an estimated cost of $46,400,000. Actual construction of the part I works shall not be initiated until the related and supporting works of part II have been authorized by Congress. ouachita river basin The project for Bayou Bartholomew, Arkansas and Louisiana, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 506, Eighty-ninth Congress, at an estimated cost of $9,360,000. The project for flood protection on the Ouachita River at Monroe, Louisiana, authorized in section 204 of the Flood Control Act of 1965, is hereby modified to provide for construction in accordance with plan B in House Document Numbered 328, Eighty-eighth Congress, at an estimated cost of $1,160,000. upper mississippi river basin The project for flood protection on the Mississippi River between river mile 195 and mile 300, Illinois and Missouri, is hereby authorized substantially in accordance with the recommendations of the Chief of 80 Stat. 1421Engineers in House Document Numbered 510, Eighty-ninth Congress, at an estimated cost of $7,193,000. ohio river basin The project for Little Sandy River and Tygarts Creek, Kentucky, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 517, Eighty-ninth Congress, at an estimated cost of $15,000,000. The project for Taylorsville Reservoir, Salt River, Kentucky, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 502, Eighty-ninth Congress, at an estimated cost of $24,800,000. The project for Stonewall Jackson Reservoir, West Fork River, West Virginia, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 109, Eighty-ninth Congress, at an estimated cost of $34,500,000. meramec river basin The project for flood protection and other purposes in the Meramec River Basin, Missouri, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 525, Eighty-ninth Congress, at an estimated cost of $45,971,000: Provided, That construction of this project shall not be initiated until the President has approved a report prepared by the Secretary of the Army reexamining the basis on which the project was formulated and the arrangements for cost sharing. great lakes basin The project for flood protection on the Maumee River at Ottawa, Ohio, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 485, Eighty-ninth Congress, at an estimated cost of $3,413,000. The project for flood protection on Red Creek, Monroe County, New York, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 107, Eighty-ninth Congress, at an estimated cost of $1,430,000. pajaro river basin The project for flood protection on the Pajaro River, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 491, Eighty-ninth Congress, at an estimated cost of $11,890,000. klamath river basin The project for flood protection on the Klamath River at and in the vicinity of Klamath, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 478, Eighty-ninth Congress, at. an estimated cost of $2,460,000. columbia river basin The project for flood protection on the Boise River, vicinity of Boise, Idaho, is hereby authorized substantially in accordance with the rec-80 Stat. 1422ommendations of the Chief of Engineers in House Document Numbered 486, Eighty-ninth Congress, at an estimated cost of $1,576,000. sacramento river basin The project for Marysville Dam and Reservoir, Yuba River Basin, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 501, Eighty-ninth Congress, at an estimated cost of $132,900,000. russian river basin The project for Knights Valley, Russian River Basin, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 518, Eighty-ninth Congress, at an estimated cost of $166,800,000. skagit river basin The project for flood protection on the Skagit River, Washington, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 483, Eighty-ninth Congress, at an estimated cost of $5,804,000.