Pub. L. 90-425, tit. I, under "construction"
construction
construction For construction, major repair, and improvement of irrigation and power systems, buildings, utilities, and other facilities; acquisition of lands and interests in lands; preparation of lands for farming; and architectural and engineering services by contract; $25,471,000, to remain available until expended: Provided, That no part of the sum herein appropriated shall be used for the acquisition of land within 82 Stat. 428 the States of Arizona, California, Colorado, New Mexico, South Dakota, and Utah outside of the boundaries of existing Indian reservations except lands authorized by law to be acquired for the Navajo Indian Irrigation Project: Provided further, That no part of this appropriation shall be used for the acquisition of land or water rights within the States of Nevada, Oregon, and Washington either inside or outside the boundaries of existing reservations except such lands as may be required for replacement of the Wild Horse Dam in the State of Nevada : Provided further, That such amounts as may be available for the construction of the Navajo Indian Irrigation Project may be transferred to the Bureau of Reclamation.