Pub. L. 91-441, tit. IV, sec. 401

Pub. L. 91-441, tit. IV, sec. 401

EnactedYear: 1970Length: 260 wordsOfficial source
Sec. 401. (a) Military construction for the Safeguard anti-ballistic missile system is authorized for the Department of the Army as follows: (1) Technical and supporting facilities and acquisition of real estate inside the United States, $22,000,000. (2) Research, development, test, and evaluation facilities at the Kwajalein Missile Range, $3,200,000. (3) Military Family Housing, four hundred units, $8,800,000: Malmstrom Safeguard site, Montana, two hundred units, Grand Forks Safeguard site, North Dakota, two hundred units. (b) There are authorized to be appropriated for the purposes of this section not to exceed $334,000,000. (c) Authorization contained in this section (except subsection (b)) shall be subject to the authorizations and limitations of the Military Construction Authorization Act, 1971, in the same manner as if such authorizations had been included in that Act. (d) Within the amounts of the authorizations of military construction for Safeguard, the Secretary of the Army or his designee is authorized to provide for, under such terms and conditions as he may determine, two hundred and twenty-five units of temporary family housing for occupancy on a rental basis by military and civilian personnel of the Department of Defense and their dependents at each Safeguard site in connection with any military construction and installation and checkout of system equipment which is or may hereafter be authorized at a Safeguard site, if the Secretary of the Army or his designee determines that such temporary housing is necessary in order to perform the construction and installation and checkout of system equipment, and that temporary housing is not otherwise available under reasonable terms and conditions.
Pub. L. 91-441, tit. IV, sec. 401 | Justis AI