Pub. L. 91-611, tit. II, sec. 201

Pub. L. 91-611, tit. II, sec. 201

EnactedYear: 1970Length: 1,329 wordsOfficial source
Sec. 201. Sections 201 and 202 and the last three sentences in section 203 of the Flood Control Act of 1968 shall apply to all projects authorized in this title. The following works of improvement for the benefit of navigation and the control of destructive floodwaters and 84 Stat. 1825 other purposes are hereby adopted and authorized to be prosecuted by the Secretary of the Army, acting through the Chief of Engineers, in accordance with the plans and subject to the conditions recommended to be the Chief of Engineers in the respective reports herein after designated. arkansas river basin The project for flood protection and other purposes on the Deep Fork River in the vicinity of Arcadia, Oklahoma, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 91–299, at an estimated cost of $24,900,000. arkansas-red river basin The project for water quality control in the Arkansas-Red River Basin, Texas, Oklahoma, and Kansas, designated as Part I, authorized by the Flood Control Act of 1966, is hereby modified to include Part II of such project, substantially in accordance with the recommendations of the Chief of Engineers in his report dated May 6, 1970, except that the amount authorized for Part. I shall be utilized for initiation and partial accomplishment of Parts I and II. Construction shall not be initiated until approved by the secretary of the army and the president. lower mississippi river basin The project for flood control and improvement of the lower Mississippi River, adopted by the Act of May 15, 1928 (45 Stat. 534), as amended and modified, is hereby further modified and expanded to include the project for flood protection within the areas of eastern Rapides and south-central Avoyelles Parishes, Louisiana, that are drained by the Bayou des daises diversion channel, and Lake Long, and their tributaries, substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 91 113, at an estimated cost of $15,333,000. missouri river basin The project for flood protection and other purposes in the Blue River Basin, vicinity of Kansas City, Missouri and Kansas, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 91–332, except that not to exceed $40,000,000 is authorized for initiation and partial accomplishment of the project. Construction of the Tomahawk Creek Reservoir shall not be initiated until the Secretary of the Army has been assured by the Chief of Engineers that the most feasible combination of improvements having the most favorable impact upon the environment and future development of the Tomahawk Creek Water-shed has been assured. The project for Oahe Dam and Reservoir, Missouri River, North Dakota, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in Senate Document Numbered 91–23, at an estimated cost of $732,000. red river of the north The project for flood protection and other purposes on Wild Rice River, Minnesota, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 366, Ninetieth Congress, at an estimated cost of $8,359,000. 84 Stat. 1826 The project, for flood protection and other purposes on the Sheyenne River, North Dakota, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 91–330, at an estimated cost of $20,000,000. souris river basin The project for Burlington Dam and Reservoir on the Souris River, North Dakota, for flood protection and other purposes, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 91–321, at an estimated cost of $29,240,000. santa barbara county coastal streams The project for flood protection on Atascadero Creek and its tributaries of Coleta, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 91–392, at an estimated cost of $13,830,000. sabine river basin The project for flood protection and other purposes in the Sabine River Basin, Texas and Louisiana, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 91–429, except that not to exceed $40,000,000 is authorized for initiation and partial accomplishment of the project. upper mississippi river basin The project for flood protection on the Mississippi River at Davenport, Iowa, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in his report dated December 4, 1970, at an estimated cost of $12,263,000. Construction shall not be initiated until approved by the Secretary of the Army and by the President. ohio river basin The project for flood protection on Mill Creek, Ohio, is hereby authorized, substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 91–413, at an estimated cost of $32,642,000. great lakes basin The project for flood protection along Red Run Drain and Lower Clinton River, Michigan,is hereby authorized, substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 91–431, except that not to exceed $40,000,000 is authorized for initiation and partial accomplishment of the project. The project for the Sandridge Dam and Reservoir, Ellicott Creek, New York, for flood protection and other purposes is hereby authorized, substantially in accordance with the recommendations of the Chief of Engineers in his report dated November 25, 1970, at an estimated cost of $19,070,000. Construction shall not be initiated until approved by the Secretary of the Army and the President. Prior to the commencement of this project, including, but not limited to, acquisition of real property, the Secretary of the Army, acting through the Chief of Engineers, shall investigate all possible alternative methods, including, but not limited to, possible relocation of elements 84 Stat. 1827of the project, installation of channels, provision of levees and flood-walls, decreasing of size of project facilities, rerouting of streams, raising or lowering pools, and deepening channels and movement on the stream, or any combination of the foregoing that can accomplish the purposes of this project and shall report Ids findings and determinations to the Congress. commonwealth of puerto rico The project for flood protection and other purposes for Portugues Dam and Reservoir, Puerto Rico, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 91–422, at an estimated cost of $11,110,000. The project for flood protection and other purposes for Cerrillos Dam and Reservoir, Puerto Rico, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 91–422, at an estimated cost of $16,351,000. The project for flood protection and other purposes for channel improvement at Ponce, Puerto Rico, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in House Document Numbered 91–422, at an estimated cost of $14,295,000. sacramento river basin The project for flood protection and other purposes on Cottonwood Creek, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in his report dated December 14, 1970, except that not to exceed $40,000,000 is authorized for initiation and partial accomplishment of the project. Construction shall not be initiated until approved by the Secretary of the Army and the President. san joaquin river basin The project for Merced County Streams, California, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in his report dated November 25, 1970, at an estimated cost of $37,260,000. Construction shall not be initiated until approved by the Secretary of the Army and the President. kaneoite-kailua area, oahu, hawaii The project for flood protection in the Kaneohe-Kailua area on the east coast of the island of Oahu, Hawaii, is hereby authorized substantially in accordance with the recommendations of the Chief of Engineers in his report dated November 23, 1970, at an estimated cost of $7,249,000. Construction shall not be initiated until approved by the Secretary of the Army and the President.
Pub. L. 91-611, tit. II, sec. 201 | Justis AI