Pub. L. 93-251, tit. II, sec. 202
Pub. L. 93-251, tit. II, sec. 202
Sec. 202. The Secretary of the Army, acting through the Chief of Engineers, is authorized to initiate the second phase of the bank erosion control works and setback levees on the Sacramento River, California, authorized by the Flood Control Act of 1960, in accordance with the recommendations of the Chief of Engineers in House Document Numbered 93–151, and the monetary authorization for the Sacramento River Basin, basically authorized by the Act of December 22, 1944, is increased by not to exceed $16,000,000 for such purpose.