Pub. L. 94-228, tit. III, sec. 302

Pub. L. 94-228, tit. III, sec. 302

EnactedYear: 1976Length: 40 wordsOfficial source
Sec. 302. The Secretary is authorized to perform modifications to the spillway structure at McKay Dam as he determines to be reasonably required for safety of the dam from failure due to overtopping by potential flood inflows to the reservoir.
Pub. L. 94-228, tit. III, sec. 302 | Justis AI