Pub. L. 95-183, tit. II, sec. 202

plant and capital equipment

EnactedYear: 1977Length: 462 wordsOfficial source
plant and capital equipment Sec. 202. Funds are hereby authorized to be appropriated to the Energy Research and Development Administration for fiscal year 1978 for plant and capital equipment, including planning, construction, acquisition, or modification of facilities (including land acquisition), and for acquisition and fabrication of capital equipment not related to construction, necessary for national security programs, as follows: (1) For laser fusion: Project 78–4–a, high energy laser facility (NOVA), Lawrence Livermore Laboratory, California, $8,000,000. (2) For weapons activities: 91 STAT. 1376 Project 78–16–a, cruise missile production facilities, various locations, $18,100,000. Project 78–16–b, full fuzing option (FUFO) bomb production facilities, various locations, $43,000,000. Project 78–16–c, high explosive flash radiography facility, Lawrence Livermore Laboratory, California, $5,000,000. Project 78–16–d, weapons safeguards, various locations, $17,000,000. Project 78–16–e, new weapons production installations, various locations, $2,000,000. Project 78–16–f, replace 10-inch water main, Bendix Plant, Kansas City, Missouri, $2,000,000. Project 78–16–g, radioactive liquid waste improvement, Los Alamos Scientific Laboratory, New Mexico (A–E only), $600,000. Project 78–16–h, Tonopah Test Range upgrade, Sandia Laboratories, Albuquerque, New Mexico, $4,000,000. Project 78–16–i, laboratory support complex, Los Alamos Scientific Laboratory, New Mexico (A–E only), $2,000,000. Project 78–17–a, production component warehouse, Pantex Plant, Amarillo, Texas (A–E only), $250,000. Project 78–17–b, surface water control system, Rocky Flats Plant, Colorado, $2,800,000. Project 78–17–c, core facilities office building, utilities and roads, Lawrence Livermore Laboratory, California (A–E only), $1,300,000. Project, 78–17–d, steam plant improvements, Y–12 Plant, Oak Ridge, Tennessee (A–E and long lead procurement only), $3,000,000. Project 78–17–e, high explosive machining facility, Pantex Plant, Amarillo, Texas, $5,000,000. (3) For special materials production: Project 78–18–a, high level waste storage and waste management facilities, Richland, Washington, $18,000,000. Project 78–18–b, high level waste storage facilities, Savannah River, South Carolina, $42,000,000. Project 78–18–c, fifth set of calcined solids storage bins, Idaho Chemical Processing Plant, Idaho National Engineering Laboratory, Idaho, $12,500,000. Project 78–18–d, new hydrofracture facility, Oak Ridge National Laboratory, Oak Ridge, Tennessee, $5,400,000. Project 78–18–e, environmental, safety and security improvements to waste management and materials processing facilities, Richland, Washington, $15,500,000. Project 78–18–f, powerhouse emission control improvements, Richland, Washington, $6,500,000. Project 78–18–g, fanhouse and increased fan capacity, H chemical separations area, Savannah River, South Carolina, $3,400,000. Project 78–18–h, plantwide fire protection, Savannah River, South Carolina, $6,300,000. Project 78–18–i, improved emergency coolant supply in reactor areas, Savannah River, South Carolina, $3,500,000. Project 78–18–j, N-reactor environmental improvements, Richland, Washington, $7,500,000. 91 STAT. 1377 (4) For project 78–21, General Plant Projects— (A) for weapons activities, $24,000,000, (B) for special materials production, $12,000,000, and (C) for naval reactor development, $2,800,000. (5) For project 78–22, construction planning and design, $5,000,000. (6) For capital equipment not related to construction— (A) for weapons activities, $79,000,000, (B) for special materials production, $36,700,000, (C) for laser fusion, $13,200,000, (D) for naval reactor development, $15,150,000, and (E) for program management and support, $300,000.
Pub. L. 95-183, tit. II, sec. 202: plant and capital equipment | Justis AI