Pub. L. 95-39, tit. I, sec. 102
plant and capital equipment
plant and capital equipment Sec. 102. (a) For “Plant and capital equipment”, including construction, acquisition, or modification of facilities, including land acquisition; and acquisition and fabrication of capital equipment not related to construction, a sum of dollars equal to the total of the following amounts: (1) Fossil energy development coal. (A) Project 77–1–a. modifications and additions to energy research centers, $6,900,000. (B) Project 77–1–b for a high Btu pipeline gas demonstration plant (which is estimated to cost a total of $500,000,000. including the non-Federal share of such cost) is authorized. The amount authorized for such plant is $10,000,000. 91 STAT. 183 (C) Project 77–1–c for fuel gas low Btu demonstration plant (which is estimated to cost a total of $380,000,000, including the non-Federal share of such cost) is authorized. The amount authorized for such plant is $5,000,000. (D) Project 77–1–d, MHD component development and integration facility, $6,700,000. (2) Conservation research and development. (A) Project 77–17-a Combustion Research Center, $8,500,000. (3) Capital equipment, not related to construction. (A) Fossil energy development, $1,020,000. (B) Conservation research and development, $12,000,000. (C) Solar energy development, $8,500,000, including $1,500,000 for initiation of activities at the Solar Energy Research Institute in the areas of modification of facilities, acquisition and fabrication of capital equipment, and design of the final installation. (D) Geothermal energy development, $2,350,000. (b) There is authorized an additional sum of $50,000,000 for the clean boiler fuel demonstration plant (project 76–1–a) authorized by section 101(b) (1) of the Act of December 31, 1975 (89 Stat. 1065). (c) There is authorized an additional sum of $15,000,000 for the five megawatt solar thermal test facility (76–2-a) authorized by section 101(b) (2) of the Act of December 31, 1975 (89 Stat. 1065). (d) Solar Energy Development: Project 77–18–j, $10,000,000 for the following solar Energy Development Projects: (i) OTEC sea test, facility, $1,000,000. (ii) one 200 kW wind energy facility, $2,000,000. (iii) total solar energy plant, $2,000,000. (iv) 5 MW solar thermal demonstration for small community, $2,000,000. (v) biomass conversion facility, $3,000,000 (A–E and long-lead procurement).