Pub. L. 102-575, tit. III, sec. 303
STREAM FLOWS.
SEC. 303. STREAM FLOWS. (a) Stream Flow Agreement.—The District shall annually provide, from project water if necessary, amounts of water sufficient to sustain the minimum stream flows established pursuant to the Stream Flow Agreement. (b) Increased Flows in the Upper Strawberry River Tributaries.— (1) the District shall acquire, on an expedited basis with funds to be provided by the Commission, or by the Secretary in the event the Commission has not been established, in accordance with State law, the provisions of this section, and the schedule specified in section 315, all of the Strawberry basin water rights being diverted to the Heber Valley through the Daniels Creek drainage and shall apply such rights to increase minimum stream flows— (A) in the upper Strawberry River and other tributaries to the Strawberry Reservoir; (B) in the lower Strawberry River from the base of Soldier Creek Dam to Starvation Reservoir; and (C) in other streams within the Uinta basin affected by the Strawberry Collection System in such a manner as deemed by the Commission in consultation with the United States Fish and Wildlife Service and the Utah State Division of Wildlife Resources to be in the best interest of fish and wildlife. The Commission’s decision under subparagraph (C) shall not establish a statutory or otherwise mandatory minimum stream flow. 106 STAT. 4633 (2) The District may acquire the water rights identified in paragraph (1) prior to completion of the facilities identified in paragraph (3) only by lease and for a period not to exceed two years from willing sellers or by replacement or exchange of water in kind. Such leases may be extended for one additional year with the consent of Wasatch and Utah counties. The District shall proceed to fulfill the purposes of this subsection on an expedited oasis but may not lease water from the Daniels Creek Irrigation Company before the beginning of fiscal year 1993. (3) (A) The District shall construct with funds provided for in paragraph (4) a Daniels Creek replacement pipeline from the Jordanelle Reservoir to the existing Daniels Creek Irrigation Company Water storage facility for the purpose of providing a permanent replacement of water in an amount equal to the Strawberry basin water being supplied by the District for stream flows provided in paragraph (1) which would otherwise have been diverted to the Daniels Creek drainage. (B) Such Daniels Creek replacement water may be exchanged by the District in accordance with State law with the Strawberry basin water identified above to provide a permanent supply of water for minimum flows provided in paragraph (1). Any such permanent replacement water so exchanged into the Strawberry basin by the District shall be tendered in accordance with State law within thirty days of its exchange by the District to the Utah Division of Wildlife Resources for the purposes of providing stream flows under paragraph (1). (C) The Daniels Creek replacement water to be supplied by the District shall be at least equal in quality and reliability to the Daniels Creek water being replaced and shall be provided by the District at a cost to the Daniels Creek Irrigation Company which does not exceed the cost of supplying existing water deliveries (including operation and maintenance) through the Daniels Creek diversion. (4) Of the amounts authorized to be appropriated by section 201, $10,500,000 shall be available to fulfill the purposes of this section as follows: (A) $500,000 for leasing of water pursuant to paragraph (2). (B) $10,000,000 for construction of the Daniels Creek replacement pipeline. (C) Funds provided by this paragraph shall not be subject to the requirements of section 204 and shall be included in the final cost allocation provided for in section 211; except that not less than $3,500,000 shall be treated as an expense under section 8, and $7,000,000 shall be treated as an expense under section 5 of the Act of April 11, 1956 (70 Stat. 110; 43 U.S.C. 105). (D) Funds provided for the Daniels Creek replacement pipeline may be expended so as to integrate such pipeline with the Wasatch County conservation measures provided for in section 207(e)(2) and the Wasatch County Water Efficiency Project authorized in section 202(a)(3). (c) Stream Flows in the Bonneville Unit.—The yield and operating plans for the Bonneville Unit of the Central Utah Project shall be established or adjusted to provide for the following minimum stream flows, which flows shall be provided continuously and in perpetuity from the date first feasible, as determined by 106 STAT. 4634 the Commission in consultation with the United States Fish and Wildlife Service and the Utah State Division of Wildlife Resources: (1) In the Diamond Fork River drainage subsequent to completion of the Monks Hollow Dam or other structure that rediverts water from the Diamond Fork River Drainage into the Diamond Fork component of the Bonneville Unit of the Central Utah Project— (A) in Sixth Water Creek, from the exit of Strawberry Valley Tunnel to the Last Chance Powerplant and Switchyard, not less than thirty-two cubic feet per second during the months of May through October and not less than twenty-five cubic feet per second during the months of November through April, and (B) in the Diamond Fork River, from the bottom of the Monks Hollow Dam to the Spanish Fork River, not less than eighty cubic feet per second during the months of May through September and not less than sixty cubic feet per second during the months of October through April, which flows shall be provided by the Bonneville Unit of the Central Utah Project. (2) In the Provo River from the base of Jordanelle Dam to Deer Creek Reservoir a minimum of one hundred and twenty-five cubic feet per second. (3) In the Provo River from the confluence of Deer Creek and the Provo River to the Olmsted Diversion a minimum of one hundred cubic feet per second. (4) Upon the acquisition of the water rights in the Provo Drainage identified in section 302, in the Provo River from the Olmsted Diversion to Utah Lake, a minimum of seventy-five cubic feet per second. (5) In the Strawberry River, from the base of Starvation Dam to the confluence with the Duchesne River, a minimum of fifteen cubic feet per second. (d) Mitigation of Excessive Flows in the Provo River.—The District shall, with public involvement, prepare and conduct a study and develop a plan to mitigate the effects of peak season flows in the Provo River. Such study and plan shall be developed in consultation with the Fish and Wildlife Service, the Utah Division of Water Rights, the Utah Division of Wildlife Resources, affected water right holders and users, the Commission, and the Bureau. The study and plan shall discuss and be based upon, at a minimum, all mitigation and conservation opportunities identified through— (1) a fishery and recreational use study that addresses anticipated peak flows (2) study of the mitigation and conservation opportunities possible through habitat or stream bed modification; (3) study of the mitigation and conservation opportunities associated with the operating agreements referred to in section 209; (4) study of the mitigation and conservation opportunities associated with the water acquisitions contemplated by section 302; (5) study of the mitigation and conservation opportunities associated with section 202(2); (6) study of the mitigation and conservation opportunities available in connection with water right exchanges; and 106 STAT. 4635 (7) study of the mitigation and conservation opportunities that could be achieved by construction of a bypass flowline from the base of Deer Creek Reservoir to the Olmsted Diversion. (e) Earmark.—Of the amounts authorized to be appropriated by section 201, $500,000 shall be available only for the implementation of subsection (d). (f) Strawberry Valley Tunnel.— (1) Upon completion of the Diamond Fork System, the Strawberry Tunnel shall not be used except for deliveries of water for the instream purposes specified in subsection (c). All other waters for the Bonneville Unit and Strawberry Valley Reclamation Project purposes shall be delivered through the Diamond Fork System. (2) Paragraph (1) shall not apply during any time in which the District, in consultation with the Commission, has determined that the Syar Tunnel or the Sixth Water Aqueduct is rendered unusable or emergency circumstances require the use of the Strawberry Valley Tunnel for the delivery of contracted Central Utah Project water and Strawberry Valley Reclamation Project water.