Pub. L. 102-575, tit. III, sec. 308
STABILIZATION OF HIGH MOUNTAIN LAKES IN THE UINTA MOUNTAINS.
SEC. 308. STABILIZATION OF HIGH MOUNTAIN LAKES IN THE UINTA MOUNTAINS. (a) Revision of Plan.—The project plan for the stabilization of high mountain lakes in the Upper Provo River drainage shall be revised to require that the following lakes will be stabilized at levels beneficial for fish habitat and recreation: Big Elk, Crystal, Duck, Fire, Island, Long, Wall, Marjorie, Pot, Star, Teapot, and Weir. Overland access by vehicles or equipment for stabilization and irrigation purposes under this subsection shall be minimized within the Lakes Management Area boundary, as depicted on the map in the Wasatch-Cache National Forest Plan (p. IV-166, dated 1987), to a level of practical necessity. (b) Costs of Rehabilitation.— (1) The costs of rehabilitating water storage features at Trial, Washington, and Lost Lakes, which are to be used for project purposes, shall be borne by the project from amounts made available pursuant to section 201. Existing roads may be used for overland access to carry out such rehabilitation. (2) The costs of stabilizing each of the lakes referred to in subsection (a) which is to be used for a purpose other than irrigation shall be treated as an expense under section 8. (c) Fish and Wildlife Habitat.—Of the amounts authorized to be appropriated by section 201, $5,000,000 shall be available only for stabilization and fish and wildlife habitat restoration in the lakes referred to in subsection (a). This amount shall be in addition to the $7,538,000 previously authorized for appropriation under section 5 of the Act of April 11, 1956 (43 U.S.C. 620g) for the stabilization and rehabilitation of the lakes described m this section.