Pub. L. 102-575, tit. III, sec. 315
FISH, WILDLIFE, AND RECREATION SCHEDULE.
SEC. 315. FISH, WILDLIFE, AND RECREATION SCHEDULE.The mitigation and conservation projects and features shall be implemented in accordance with the following schedule: 106 STAT. 4642 FISH, WILDLIFE, AND RECREATION MITIGATION AND CONSERVATION SCHEDULE I. budget to implement additional reclamation mitigation Projects and Features Appropriations (Thousands of 1990 Dollars) TOTAL FY93 FY94 FY95 Instream flows: 1.a. Lease of Daniels Creek water rights 1500 $500 $0 $0 b. Acquisition of Daniels Creek water rights to restore Upper Strawberry River flows and the Daniele Creek replacement pipeline (13,500,000 shall be treated as section 8) [Sec. 303(b)] $10,000 $10,000 $0 $0 2.a. Acquisition of 25,000 AF on Provo River for streamflows from Murdock Diversion to Utah Lake [Sec. 302) $15,000 $5,000 $5,000 5,000 b. Modify or replace diversion structures on Provo River from Murdock Diversion to Utah Lake [Sec. 302] $4,000 $500 $1,600 $1,500 3. Study and mitigation plan for eacesaive flows in the Provo River [Sec. 303(d)] $500 $100 $100 $100 Subtotal $30,000 $16,100 $6,600 $6,600 FY96 FY97 FY98 Instream flows: 1.a. Lease of Daniels Creek water rights $0 $0 $0 b. Acquisition of Daniels Creek water rights to restore Upper Strawberry River flows and the Daniels Creek replacement pipeline ($3,500,000 shall be treated as section 8) [Sec. 303(b)] $0 $0 $0 2.a. Acquisition of 25,000 AF on Provo River for streamflows from Murdock Diversion to Utah Lake (Sec. 302] $0 $0 $0 b. Modify or replace diversion structures on Provo River from Murdock Diversion to Utah Lake [See. 302] $500 $0 $0 3. Study and mitigation plan for excessive flows in the Provo River (Sec. 303(d)) $100 $100 $0 Subtotal $600 $100 $0 TOTAL FY93 FY94 FY05 Wildlife lands and improvement: 1. Acquisition of big game winter range [Sec. 305(a)] $1,300 $0 $100 $200 2. Construction of big game crossings and escape ramps Provo Res. Canal. High line Canal, Strawberry Power Canal or others [Sec. 305(b)] $750 $0 $0 $260 Subtotal $2,050 $0 $100 $450 FY96 FY97 FY98 Wildlife lands and improvement: 1. Acquisition of big game winter range [Sec. 305(a)] $500 $500 $0 106 STAT. 4643 FISH, WILDLIFE, AND RECREATION MITIGATION AND CONSERVATION SCHEDULE—Continued I. budget to implement additional reclamation mitigation Projects and Features Appropriations (Thousands of 1990 Dollars) TOTAL FY93 FY94 FY95 2. Construction of big game crossings and escape ramps—Provo Res. Canal, High line Cana), Strawberry Power Canal or others (Sec. 306(b)) $250 $250 $0 Subtotal $750 $750 $0 FY96 FY97 FY98 Wetland acquisition, rehabilitation, and development: 1. Rehabilitation enhancement of wetlands around Great Salt Lake [Sec, 306(a)] $14,000 $1,000 $2,600 $2,600 2. Wetland acquisition along the Jordan River [Sec, 311(e)] $7,000 $300 $1,200 $1,500 3. Inventory of sensitive species and ecosystem! [Sec. 306(b)] $1,500 $250 $250 $250 4. Acquisition of lands, waters, and interests for Utah Lake Wetland Preserve [Sec. 306(c)(9)] $16,690 $1,690 $3,000 $3,000 Subtotal $39,190 $3,240 $7,050 $7,350 FY96 FY97 FY98 Wetland acquisition, rehabilitation, and development 1. Rehabilitation 4 enhancement of wetlands around Great Salt Lake [Sec. 306(a)] $2,600 $2,600 $2,600 2. Wetland acquisition along the Jordan River [Sec. 311(c)] $2,000 $2,600 $0 3. Inventory of sensitive species and ecosystems [Sec. 306(b)] $250 $250 $250 4. Acquisition of lands, waters, and interests for Utah Lake Wetland Preserve [Sec. 303(c)(9)] $3,000 $3,000 $3,000 Subtotal $7,850 $7,850 $5,650 TOTAL FY93 FY94 FY95 Fisheries acquisition and restoration: 1. Fish habitat restoration on Provo River between Jordanelle Dam and Deer Creek Reservoir [Sec. 307(1)1 $750 $50 $0 $100 2. Fish habitat improvements to streams impacted by Federal reclamation projects in Utah [See. 307(2)] $4,000 $0 $400 $600 3. Rehabilitation of tributaries to Strawberry Reservoir for trout reproduction [Sec. 307(3)] $1,000 $200 $200 $200 4. Strawberry Reservoir post-treatment management and development [See. 307(4)] $1,500 $300 $300 $300 5. Study and facilitate development to improve Utah Lake warm-water fishery [Sec. 307(5)] $1,000 $150 $160 $200 106 STAT. 4644 FISH, WILDLIFE, AND RECREATION MITIGATION AND CONSERVATION SCHEDULE—Continued I. budget to implement additional reclamation mitigation Projects and Features Appropriations (Thousands of 1990 Dollars) TOTAL FY93 FY94 FY95 6. Fish habitat improvements to Diamond Fork and Sixth Water Creek drainages [Sec. 307(6)] $1,000 $0 $0 $0 7. Restoration of native cutthroat trout populations [Sec. 307(7)] $475 $50 $50 $75 6. Fish habitat improvements to the Jordan River [Sec. 311(a)] $1,150 $0 $0 $100 9. Stabilization of Upper Provo River reservoirs for fishery improvement [Sec, 308] $5,000 $0 $0 $0 10. Development of additional fish hatchery production for CRSP waters in Utah [Sec. 313] $22,800 $100 $3,500 $4,200 Subtotal $38.675 $850 $4,600 $5,775 FY96 FY97 FY98 Fisheries acquisition and restoration: 1. Fish habitat restoration on Provo River between Jordanelle Dam and Deer Creek Reservoir (Sec. 307(1)] $200 $200 $200 2. Fish habitat improvements to streams impacted by Federal reclamation projects in Utah [Sec. 307(21) $1,000 $1,000 $1,000 3. Rehabilitation of tributaries to Strawberry Reservoir for trout reproduction [Sec. 307(3)] $200 $200 $0 4. Strawberry Reservoir poet-treatment management and development [Sec. 307(4)] $300 $300 $0 5. Study and facilitate development to improve Utah Lake warmwater fishery [Sec. 307(5)] $150 $150 $200 6. Fish habitat improvements to Diamond Fork and Sixth Water Creek drainages [Sec. 307(6)] $100 $500 $400 7. Restoration of native cutthroat trout populations (Sec. 307(7)] $100 $100 $100 8. Fish habitat improvements to the Jordan River [Sec. 311(a)] $300 $400 $350 9. Stabilisation of Upper Provo River reservoire for fishery improvement (Sec. 303] $500 $2,000 $2,500 10. Development of additional fish hatchery production for CRSP waters in Utah [Sec. 313] $5,000 $5,000 $5,000 Subtotal $7,850 $9,850 $9,750 TOTAL FY93 FY94 FY95 Watershed improvements; 1. Projects for watershed improvement, erosion control, wildlife range improvements in Avintaquin Cr, Red Cr, Currant Cr and other drainages [Sec. 307(8)] $2,500 $0 $500 $500 2. Watershed, stream and riparian improvements in Fremont River drainage [Sec. 313(a)] $1,126 $125 $200 $200 106 STAT. 4645 FISH, WILDLIFE, AND RECREATION MITIGATION AND CONSERVATION SCHEDULE—Continued I. budget to implement additional reclamation mitigation Projects and Features Appropriations (Thousands of 1990 Dollars) TOTAL FY93 FY94 FY95 3. Small dam and watershed improvements in the CRSP area in Utah (Sec. 313(b)] $4,000 $500 $700 $700 Subtotal $7,626 $625 $1,400 $1,400 FY96 FY97 FY98 Watershed Improvements: 1. Projects for watershed improvement, erosion control, wildlife range improvements in Avintaquin Cr, Red Cr, Currant Cr and other drainages [Sec. 307(8))] $500 $500 $500 2. Watershed, stream and riparian improvements in Fremont River drainage [Sec. 313(a)] .. $200 $200 $200 3. Small dam and watershed improvements in the CRSP area in Utah [Sec. 313(b)) $700 $700 $700 Subtotal $1,400 $1,400 $1,400 TOTAL FY93 FY94 FY96 Stream Access and Riparian Habitat Development: 1. Rehabilitation of riparian habitat along Provo River from Jordanelle Dam to Utah Lake [Sec. 309(a)(1)] $760 $0 $250 $250 2. Restoration of watersheds and riparian habitats in the Diamond Fork and Sixth Water Creek drainages [Sec. 309(a)(2)] $250 $0 $0 $50 3. Watershed stabilization, terrestrial wildlife habitat improvements and road closures [Sec. 309(a)(3)] $350 $0 $0 $50 4. Acquisition of angler and other recreational access, in addition to the 1988 DPR [Sec. 309(a)(4)] $8,500 $500 $1,000 $1,500 5. Study of riparian impacts caused by CUP from reduced streamflows, and identify mitigation opportunities [Sec. 309(b)] $400 $50 $75 $75 8. Riparian rehabilitation and development along Jordan River [Sec. 311(b)] $750 $75 $75 $150 Subtotal $11,000 $625 $1,400 $2,075 FY96 FY97 FY98 Stream Access and Riparian Habitat Development 1. Rehabilitation of riparian habitat along Provo River from Jordanelle Dam to Utah Lake [Sec. 309(a)(1)] $250 $0 $0 2. Restoration of watersheds and riparian habitats in the Diamond Fork and Sixth Water Creek drainages [[Sec. 309(a)(2)] $100 $100 $0 106 STAT. 4646 FISH, WILDLIFE, AND RECREATION MITIGATION AND CONSERVATION SCHEDULE—Continued I. budget to implement additional reclamation mitigation Projects and Features Appropriations (Thousands of 1990 Dollars) TOTAL FY93 FY94 FY95 3. Watershed stabilization, terrestrial wildlife habitat improvements and road closures [Sec. 309(a)(3)] $100 $100 $100 4. Acquisition of angler and other recreational access, in addition to the 1988 DPS [Sec. 309(a)(4)] $1,300 $2,000 $2,000 5. Study of riparian impact caused by CUP from reduced stream flows, and identify mitigation opportunities [Sec. 309(b)] $75 $75 $50 6. Riparian rehabilitation and development along Jordan River [Sec. 311(b)]. $150 $150 $150 Subtotal $2,175 $2,425 $2,300 TOTAL FY93 FY94 FY95 Recreation funds: 1. Recreational improvements at Utah Lake [Sec. 312(a)] $2,000 $125 $275 $400 2, Recreation facilities at other CUP feature#, a# recommended [Sec. 312(b)] $750 $50 $100 $150 3. Provo /Jordan River Parkway Development [Sec, 311(d)] $1,000 $0 $75 $75 4. Provo River corridor development [Sec. 311(e)] $1,000 $0 $75 $75 Subtotal $4,750 $175 $525 $700 Total Additional $133,290 $21,615 $21,676 $24,350 FY96 FY97 FY98 Recreation funds: 1. Recreational improvement at Utah Lake [Sec. 312(a)] $400 $400 $400 2. Recreation facilities al other CUP features, as recommended [Sec. 312(b)] $150 $150 $150 3. Provo/Jordan River Parkway Development [Sec. 311(d)] $200 $300 $350 4. Provo River corridor development [Sec, 311(e)] $200 $300 $350 Subtotal $950 $1,150 $1,250 Total Additional $21,576 $23,525 $20,550 Strawberry collection system: 1. Acquire angler access on about 35 miles of streams identified in the Aquatic Mitigation Plan $2,700 $900 $900 $900 2. Construct fish habitat improvements on about 70 miles of streams as identified in the Aquatic Mitigation Plan $3,990 $066 $803 $790 3. Rehabilitation of Strawberry Project wildlife and riparian habitat $3,000 $600 $600 $600 Subtotal $9,690 $3,966 $1,403 $1,390 106 STAT. 4647 FISH, WILDLIFE, AND RECREATION MITIGATION AND CONSERVATION SCHEDULE—Continued I. budget to implement additional reclamation mitigation Projects and Features Appropriations (Thousands of 1990 Dollars) TOTAL FY93 FY94 FY95 FY96 FY97 FY98 Strawberry collection system: 1. Acquire angler access on about 35 miles of streams identified in the Aquatic Mitigation Plan $0 $0 $0 2. Construct fish habitat improvements on about 70 miles of streams as identified in the Aquatic Mitigation Plan $453 $604 $674 3. Rehabilitation of Strawberry Project wildlife and riparian habitats $600 $600 $0 Subtotal $1,063 $1,204 $674 TOTAL FY93 FY94 FY96 Duchesne canal rehabilitation: 1. Acquire and develop 782 acres along Duchesne River $160 $160 $0 $0 Subtotal $160 $160 $0 $0 FY96 FY97 FY98 Duchesne canal rehabilitation: 1, Acquire and develop 782 acres along Duchesne River . $0 $0 $0 Subtotal $0 $0 $0 TOTAL FY93 FY94 FY95 Municipal and industry ayatem: 1. Fence and develop big game on north shoreline of Jordanelle Reservoir $326 $100 $126 $0 2. Acquire angler access to entire reach of Provo River from Jordanelle Dam to Deer Creek Reservoir $1,050 $625 $525 $0 3. Acquire and develop 100 acres of wetland at base of Jordanelle $900 $900 $0 $0 Subtotal $2,176 $1,525 $651 $0 Total DPR $12,026 $5,651 $2,054 $1,390 Grand Total $145,316 $27,266 $23,729 $25,740 FY96 FY97 FY98 Municipal and industry system: 1, Fence and develop big game on north ahoreline of Jordanelle Reservoir. $0 $0 $0 2. Acquire angler access to entire reach of Provo River from Jordanelle Dam to Deer Creek $0 $0 $0 3. Acquire and develop 100 acres of wetland at base of Jordanelle $0 $0 $0 Subtotal $0 $0 $0 106 STAT. 4648 FISH, WILDLIFE, AND RECREATION MITIGATION AND CONSERVATION SCHEDULE—Continued I. budget to implement additional reclamation mitigation Projects and Features Appropriations (Thousands of 1990 Dollars) TOTAL FY93 FY94 FY95 Total DPR $ 1,053 $1,204 $674 Grand Total $22,628 $24,729 $21,224