Pub. L. 102-575, tit. XVIII, sec. 1809

REPLACEMENT POWER.

EnactedYear: 1992Length: 149 wordsOfficial source
SEC. 1809. REPLACEMENT POWER.The Secretary of Energy in consultation with the Secretary of the Interior and with representatives of the Colorado River Storage Project power customers, environmental organizations and the States of Arizona, California, Colorado, Nevada, New Mexico, Utah, and Wyoming shall identify economically and technically feasible methods of replacing any power generation that is lost through adoption of long-term operational criteria for Glen Canyon Dam as required by section 1804 of this title. The Secretary shall present a report of the findings, and implementing draft legislation, if necessary, not later than two years after adoption of long-term operating criteria. The Secretary shall include an investigation of the feasibility of adjusting operations at Hoover Dam to replace all or part of such lost generation. The Secretary shall include an investigation of the modifications or additions to the trans-mission system that may be required to acquire and deliver replacement power.
Pub. L. 102-575, tit. XVIII, sec. 1809: REPLACEMENT POWER. | Justis AI