Pub. L. 102-575, tit. XXIII, sec. 2302
TRANSFER OF OPERATION AND MAINTENANCE RESPONSIBILITY OF PLATORO RESERVOIR.
SEC. 2302. TRANSFER OF OPERATION AND MAINTENANCE RESPONSIBILITY OF PLATORO RESERVOIR. (a) In General.—The Secretary is authorized and directed to undertake the following: (1) Accept a one-time payment of $450,000 from the district in lieu of the repayment obligation of paragraphs 8(d) and 11 of the Repayment Contract between the United States and the District (Number 11r–1529) as amended. (2) Enter into an agreement for the transfer of all of the operation and maintenance functions of the Platoro Dam and Reservoir, including the operation and maintenance of the reservoir for flood control purposes, to the District. The agreement shall provide— (A) that the District will have the exclusive responsibility for operations and the sole obligation for all of the maintenance of the reservoir in a satisfactory condition for the life of the reservoir subject to review of such maintenance by the Secretary to ensure compliance with reason-able operation, maintenance and dam safety requirements as they apply to Platoro Dam, and Reservoir under Federal and State law; and, (B) that the District shall have the exclusive use and sole responsibility for maintenance of all associated facilities, including outlet works, remote control equipment, spillway, and land and buildings in the Platoro townsite. The District shall have sole responsibility for maintaining the land and buildings in a condition satisfactory to the United States Forest Service. (b) Title.—Title to the Platoro Dam and Reservoir and all associated facilities shall remain with the United States, and authority to make recreational use of Platoro Dam and Reservoir shall be under the control and supervision of the United States Forest Service, Department of Agriculture. (c) Amendments to Contract.—The Secretary is authorized to enter into such other amendments to such contract Number Ilr–1529, as amended, necessary to facilitate the intended operations of the project by the District. All applicable provisions of the Federal reclamation laws shall remain in effect with respect to such contract. (d) Conditions Imposed Upon the District.—The transfer of operation and maintenance responsibility under subsection (a) shall be subject to the following conditions: (1) (A) The district will, after consultation with the United States Forest Service, Department of Agriculture, operate the Platoro Dam and Reservoir in such a way as to provide— (i) that releases of bypass from the reservoir flush out the channel of the Conejos River periodically in the spring or early summer to maintain the hydrologic regime of the river; and 106 STAT. 4686 (ii) that any releases from the reservoir contribute to even flows in the river as far as possible from October 1 to December 1 so as to be sensitive to the brown trout spawn. (B) Operation of the Platoro Dam and Reservoir by the District for water supply uses (including storage and exchange of water rights owned by the District or its constituents), inter-state compact and flood control purposes shall be senior and paramount to the channel flushing and fishery objectives referred to in subparagraph (A). (2) The District will provide and maintain a permanent pool in the Platoro Reservoir for fish, wildlife, and recreation purposes, in the amount of three thousand acre-feet, including the initial filling of the pool and periodic replenishment of seepage and evaporation loss: Provided, however, That if necessary to maintain the winter instream flow provided in subparagraph (3), the permanent pool may be allowed to be reduced to two thousand four hundred acre-feet. (3) In order to preserve fish and wildlife habitat below Platoro Reservoir, the District shall maintain releases of water from Platoro Reservoir of seven cubic feet per second during the months of October through April and shall bypass forty cubic feet per second or natural inflow, whichever is less, during the months of May through September. (4) The United States Forest Service, Department of Agriculture, is directed to regularly monitor operation of Platoro Reservoir, including releases from it for instream flow purposes, and to enforce the provisions of this subsection under the laws, regulations, and rules applicable to the National Forest System. (e) Flood Control Management.—The Secretary of the Army, acting through the Chief of Engineers, shall retain exclusive authority over Platoro Dam and Reservoir for flood control purposes and shall direct the District in the operation of the dam for such purposes. To the extent possible, management by the Secretary of the Army under this subsection shall be consistent with the water supply use of the reservoir, with the administration of the Rio Grande Compact of 1939 by the Colorado State Engineer and with the provisions of subsection (d) hereof. The Secretary of the Army shall enter into a Letter of Understanding with the District and the United States Bureau of Reclamation prior to transfer of operations which details the responsibility of each party and specifies the flood control criteria for the reservoir. (f) Compliance with Compact and Other Laws.—The transfer under section 2302 shall be subject to the District’s compliance with the Rio Grande Compact of 1939 and all other applicable laws and regulations, whether of the State of Colorado or of the United States.