Pub. L. 102-580, tit. I, sec. 115

CONTINUATION OF AUTHORIZATION OF CERTAIN PROJECTS AND STUDIES.

EnactedYear: 1992Length: 328 wordsOfficial source
SEC. 115. CONTINUATION OF AUTHORIZATION OF CERTAIN PROJECTS AND STUDIES. (a) General Rule for Projects.— Notwithstanding section 1001 of the Water Resources Development Act of 1986, the following projects shall remain authorized to be carried out by the Secretary: (1) Green bay levee district, iowa.— The project for flood control, Green Bay Levee District, Iowa, authorized by section 401(a) of the Water Resources Development Act of 1986 (100 Stat. 4115). (2) Lake pontchartrain, north shore, Louisiana.— The project for beach erosion control, navigation, and recreation, Lake Pontchartrain, North Shore, Louisiana, authorized by section 601 of the Water Resources Development of 1986 (100 Stat. 4142). (3) St. johns bayou and new madrid floodway, missouri.— The project for flood control, St. Johns Bayou and New Madrid Floodway, Missouri, authorized by section 401(a) of the Water Resources Development Act of 1986 (100 Stat. 4118). (4) Deal lake, monmouth county, new jersey.— The project for removal of silt and stumps and the control of pollution from nonpoint sources, Deal Lake, Monmouth County, New Jersey, authorized by section 602 of the Water Resources Development Act of 1986 (100 Stat. 4148–4149). (5) Tyrone, Pennsylvania.— The project for flood protection, Tyrone, Pennsylvania, on the Little Juniata River authorized by section 10 of the Flood Control Act of December 23, 1944 (58 Stat. 893). The Secretary shall examine lower cost alternative measures for providing flood protection for Tyrone, Pennsylvania, and submit to Congress a report on the results of such examination not later than April 1, 1994. (6) Big pine lake, Texas.— The project for flood control. Big Pine Lake, Texas, authorized by section 203 of the Flood Control Act of 1962 (76 Stat. 1186). (b) Limitation.— A project described in subsection (a) shall not be authorized for construction after the last day of the 5-year period that begins on the date of the enactment of this Act unless, during such period, funds have been obligated for the construction (including planning and design) of the project.