Pub. L. 103-316, tit. I, under "construction, general"
construction, general
construction, general For the prosecution of river and harbor, flood control, shore protection, and related projects authorized by laws; and detailed studies, and plans and specifications, of projects (including those for development with participation or under consideration for participation by States, local governments, or private groups) authorized or made eligible for selection by law (but such studies shall not constitute a commitment of the Government to construction), $983,668,000, to remain available until expended, of which such sums as are necessary pursuant to Public Law 99–662 shall be derived from the Inland Waterways Trust Fund, for one-half of the costs of construction and rehabilitation of inland waterways projects, including rehabilitation costs for the Lock and Dam 25, Mississippi River, Illinois and Missouri, and GIWW-Brazos River Floodgates, Texas, projects, and of which funds are provided for the following projects in the amounts specified: Red River Emergency Bank Protection, Arkansas and Louisiana, $6,000,000; Red River below Denison Dam Levee and Bank Stabilization, Arkansas, Louisiana and Texas, $2,100,000; West Sacramento, California, $500,000; Sacramento River Flood Control Project (Glenn-Colusa Irrigation District), California, $400,000; Sacramento River Flood Control Project (Deficiency Correction), California, $3,700,000; San Timoteo Creek (Santa Ana River Mainstem), California, $5,000,000; Central and Southern Florida, Florida, $8,624,000; Kissimmee River, Florida, $4,000,000; Savannah Harbor Deepening, Georgia (Reimbursement), $11,585,000, of which $2,083,000 is for a cost-shared Savannah River recreation enhancement and public access project along 900 linear feet of shoreline in the City of Savannah; Casino Beach, Illinois, $1,000,000; Des Moines Recreational River and Greenbelt, Iowa, $4,000,000; Harlan (Levisa and Tug Forks of the Big Sandy River and Upper Cumberland River), Kentucky, $20,000,000; Middlesborough (Levisa and Tug Forks of the Big Sandy River and Upper Cumberland River), Kentucky, $1,200,000; Williamsburg (Levisa and Tug Forks of the Big Sandy River and Upper Cumberland River), Kentucky, $3,000,000; Pike County (Levisa and Tug Forks of the Big Sandy River and Upper Cumberland River), Kentucky, $5,000,000; Lake Pontchartrain and Vicinity (Jefferson Parish), Louisiana, $800,000; Lake Pontchartrain and Vicinity (Hurricane Protection), Louisiana, $12,500,000; Ouachita River Levees, Louisiana, $4,500,000; Ste. Genevieve, Missouri, $3,000,000; Hackensack Meadowlands Area, New Jersey, $2,500,000; 108 STAT. 1709 Ramapo River at Oakland, New Jersey, $600,000; Salem River, New Jersey, $1,000,000; Carolina Beach and Vicinity, North Carolina, $2,800,000; Fort Fisher and Vicinity, North Carolina, $900,000; Broad Top Region, Pennsylvania, $1,000,000; Lackawanna River, Olyphant, Pennsylvania, $1,100,000; Lackawanna River, Scranton, Pennsylvania, $1,000,000; South Central Pennsylvania Environmental Restoration Infrastructure and Resource Protection Development Pilot Program, Pennsylvania, $7,000,000; Allendale Dam, Rhode Island, $67,500; Wallisville Lake, Texas, $1,000,000; Richmond Filtration Plant, Virginia, $2,000,000; Southern West Virginia Environmental Restoration Infrastructure and Resource Protection Development Pilot Program, West Virginia, $1,500,000; Hatfield Bottom (Levisa and Tug Forks of the Big Sandy River and Upper Cumberland River), West Virginia, $500,000; and Upper Mingo County (Levisa and Tug Forks of the Big Sandy River and Upper Cumberland River), West Virginia, $250,000: Provided, That of the offsetting collections credited to this account, $71,000 are permanently canceled.