Pub. L. 103-355, tit. III, subtit. A, sec. 3004

REQUIREMENT FOR INDEPENDENT COST ESTIMATE AND MANPOWER ESTIMATE BEFORE DEVELOPMENT OR PRODUCTION.

EnactedYear: 1994Length: 247 wordsOfficial source
SEC. 3004. REQUIREMENT FOR INDEPENDENT COST ESTIMATE AND MANPOWER ESTIMATE BEFORE DEVELOPMENT OR PRODUCTION. (a) Content and Submission of Estimates.— Subsection (b) of section 2434 of title 10, United States Code, is amended to read as follows: “(b) Regulations.— The Secretary of Defense shall prescribe regulations governing the content and submission of the estimates required by subsection (a). The regulations shall require— “(1) that the independent estimate of the full life-cycle cost of a program— “(A) be prepared by an office or other entity that is not under the supervision, direction, or control of the military department, Defense Agency, or other component of the Department of Defense that is directly responsible for carrying out the development or acquisition of the program; and “(B) include all costs of development, procurement, military construction, and operations and support, without regard to funding source or management control; and “(2) that the manpower estimate include an estimate of the total number of personnel required— “(A) to operate, maintain, and support the program upon full operational deployment; and “(B) to train personnel to carry out the activities referred to in subparagraph (A).”. (b) Terminology Correction, Etc.— Subsection (a) of such section is amended— (1) by striking out “full-scale engineering development” and inserting in lieu thereof “engineering and manufacturing development”; and (2) by striking out “cost of the program, together with a manpower estimate, has” and inserting in lieu thereof “full life-cycle cost of the program and a manpower estimate for the program have”.
Pub. L. 103-355, tit. III, subtit. A, sec. 3004: REQUIREMENT FOR INDEPENDENT COST ESTIMATE AND MANPOWER ESTIMATE BEFORE DEVELOPMENT OR PRODUCTION. | Justis AI