Pub. L. 103-434, tit. XII, sec. 1208

CHANDLER PUMPING PLANT AND POWERPLANT-OPERATIONS AT PROSSER DIVERSION DAM.

EnactedYear: 1994Length: 439 wordsOfficial source
SEC. 1208. CHANDLER PUMPING PLANT AND POWERPLANT-OPERATIONS AT PROSSER DIVERSION DAM. (a) Authorization of Appropriations .or Electrification.— In order to provide for electrification to enhance instream flows by eliminating the need to divert water to operate the hydraulic turbines which pump water to the Kennewick Irrigation District, there is authorized to be appropriated— (1) $50,000 to conduct an assessment of opportunities for alternative pumping plant locations; (2) $4,000,000 for construction; and (3) such sums as may be necessary for the prorata share of the operation and maintenance allocated to fish and wildlife as determined by the Secretary. (b) Power for Project Pumping.— (1) The Administrator of the Bonneville Power Administration shall provide for project power needed to effect the electrification as provided in subsection (a). (2) (A) There is authorized to be appropriated for the Bureau of Reclamation for each fiscal year in which the Administrator provides power under this subsection an amount equal to the cost to the Bonneville Power Administration of providing power under this subsection during such fiscal year. The rate to be utilized by the Administrator in determining the cost of power under this paragraph in a fiscal year shall be the rate for priority firm power charged by the Bonneville Power Administration in that fiscal year under section 7(b) of the Pacific Northwest Electric Power Planning and Conservation Act (16 U.S.C. 839e(b)). (B) The Bureau of Reclamation shall, using funds appropriated pursuant to the authorization of appropriations in subparagraph (A), reimburse the Bonneville Power Administration for the costs of the project power provided under this subsection. Such funds shall be available for such purpose without fiscal year limitation. (c) Subordination. —Any diversions for hydropower generation at the Chandler Powerplant shall be subordinated to meet the flow targets determined under subsection (f). (d) Water Supply for Kennewick Irrigation District.— The Secretary shall ensure that the irrigation water supply for the Kennewick Irrigation District shall not be affected by conserva-108 STAT. 4563tion, electrification, or subordination pursuant to this title and any reduction in its irrigation water supply resulting from conservation measures adopted or implemented by other entities pursuant to this title shall be replaced by water developed through subordination, electrification, or a combination of the two. (e) Treatment of Certain Funds. —Funds appropriated and project power provided pursuant to this section shall be non-reimbursable since such funds are used for fish and wildlife purposes and such funds are not subject to cost share under section 1203(d). (f) Target Flows. —Target flows measured at appropriate biological and hydrological location or locations shall be determined by the Yakima Project Superintendent in consultation with the System Operations Advisory Committee.