Pub. L. 104-303, tit. III, sec. 364

PROJECT DEAUTHORIZATIONS.

EnactedYear: 1996Length: 4,039 wordsOfficial source
SEC. 364. PROJECT DEAUTHORIZATIONS.The following projects are not authorized after the date of the enactment of this Act: (1) Branford harbor, connecticut.—The 2,267 square foot portion of the project for navigation in the Branford River, Branford Harbor, Connecticut, authorized by the 1st section of the Act entitled “An Act making appropriations for the construction, repair, and preservation of certain public works on rivers and harbors, and for other purposes”, approved June 13, 1902 (32 Stat. 333), lying shoreward of a line described as follows: Beginning at a point on the authorized Federal navigation channel line the coordinates of which are N156,181.32, E581,572.38, running thence south 70 degrees, 11 minutes, 8 seconds west a distance of 171.58 feet to another point on the authorized Federal navigation channel line the coordinates of which are N156,123.16, E581,410.96. (2) Bridgeport harbor, connecticut.—(A) Anchorage area.—The portion of the project for navigation, Bridgeport Harbor, Connecticut, authorized by section 101 of the River and Harbor Act of 1958 (72 Stat. 297), consisting of a 2-acre anchorage area with a depth of 6 feet at the head of Johnsons River between the Federal channel and Hollisters Dam. (B) Johnsons river channel.—The portion of the project for navigation, Johnsons River Channel, Bridgeport Harbor, Connecticut, authorized by the 1st section of the Act entitled “An Act authorizing the construction, repair, and preservation of certain public works on rivers and harbors, and for other purposes”, approved July 24, 1946 (60 Stat. 634), that is northerly of a line across the Federal channel the coordinates of which are north 123318.35, east 486301.68, and north 123257.15, east 486380.77. (3) Guilford harbor, connecticut.—The portion of the project for navigation, Guilford Harbor, Connecticut, authorized by section 2 of the Act entitled “An Act authorizing the construction, repair, and preservation of certain public works on rivers and harbors, and for other purposes”, approved March 2, 1945 (59 Stat. 13), that consists of the 6-foot deep channel in Sluice Creek and that is not included in the following description of the realigned channel: Beginning at a point where the Sluice Creek Channel intersects with the main entrance channel, N159194.63, E623201.07, thence running north 24 degrees, 58 minutes, 15.2 seconds west 478.40 feet to a point N159628.31, E622999.11, thence running north 20 degrees, 18 minutes, 31.7 seconds west 351.53 feet to a point N159957.99, E622877.10, thence running north 69 degrees, 41 minutes, 37.9 seconds east 55.00 feet to a point N159977.08, E622928.69,110 STAT. 3732 thence turning and running south 20 degrees, 18 minutes, 31.0 seconds east 349.35 feet to a point N159649.45, E623049.94, thence turning and running south 24 degrees, 58 minutes, 11.1 seconds east 341.36 feet to a point N159340.00, E623194.04, thence turning and running south 90 degrees, 0 minutes, 0 seconds east 78.86 feet to a point N159340.00, E623272.90. (4) Mystic river, connecticut.—The following portion of the project for improving the Mystic River, Connecticut, authorized by the 1st section of the Act entitled “An Act making appropriations for the construction, repair, and preservation of certain public works on rivers and harbors, and for other purposes”, approved March 4, 1913 (37 Stat. 802): Beginning in the 15-foot deep channel at coordinates north 190860.82, east 814416.20, thence running southeast about 52.01 feet to the coordinates north 190809.47, east 814424.49, thence running southwest about 34.02 feet to coordinates north 190780.46, east 814406.70, thence running north about 80.91 feet to the point of beginning. (5) Norwalk harbor, connecticut.—(A) In general.—The following portions of projects for navigation, Norwalk Harbor, Connecticut: (i) The portion authorized by the 1st section of the Act entitled “An Act making appropriations for the construction, repair, and preservation of certain public works on rivers and harbors, and for other purposes”, approved March 2, 1919 (40 Stat. 1276), that lies northerly of a line across the Federal channel having coordinates N104199.72, E417774.12 and N104155.59, E417628.96. (ii) The portions of the 6-foot deep East Norwalk Channel and Anchorage, authorized by section 2 of the Act entitled “An Act authorizing the construction, repair, and preservation of certain public works on rivers and harbors, and for other purposes”, approved March 2, 1945 (59 Stat. 13), that are not included in the description of the realigned channel and anchorage set forth in subparagraph (B). (B) Description of realigned channel and anchorage.—The realigned 6-foot deep East Norwalk Channel and Anchorage referred to in subparagraph (A)(ii) is described as follows: Beginning at a point on the East Norwalk Channel, N95743.02, E419581.37, thence running northwesterly about 463.96 feet to a point N96197.93, E419490.18, thence running northwesterly about 549.32 feet to a point N96608.49, E419125.23, thence running northwesterly about 384.06 feet to a point N96965.94, E418984.75, thence running northwesterly about 407.26 feet to a point N97353.87, E418860.78, thence running westerly about 58.26 feet to a point N97336.26, E418805.24, thence running northwesterly about 70.99 feet to a point N97390.30, E418759.21, thence running westerly about 71.78 feet to a point on the anchorage limit N97405.26, E418689.01, thence running southerly along the western limits of the Federal anchorage in existence on the date of the enactment of this Act until reaching a point N95893.74, E419449.17, thence running in a southwesterly110 STAT. 3733 direction about 78.74 feet to a point on the East Norwalk Channel N95815.62, E419439.33. (C) Designation of realigned channel and anchorage.—All of the realigned channel shall be redesignated as an anchorage, with the exception of the portion of the channel that narrows to a width of 100 feet and terminates at a line the coordinates of which are N96456.81, E419260.06 and N96390.37, E419185.32, which shall remain as a channel. (6) Patchogue river, westbrook, connecticut.—(A) In general.—The following portion of the project for navigation, Patchogue River, Connecticut, authorized by section 101 of the River and Harbor Act of 1954 (68 Stat. 1249): A portion of the 8-foot deep channel that lies northwesterly of a line whose coordinates are N161108.83, E676901.34 and N161246.53, E677103.75. The perimeter of this area starts at a point with coordinates N161108.83, E676901.34, thence running north 7 degrees, 50 minutes, 44.2 seconds west 27.91 feet to a point N161136.48, E676897.53, thence running north 55 degrees, 46 minutes, 23.3 seconds east 190.05 feet to a point N161243.38, E677054.67, thence running north 86 degrees, 19 minutes, 39.9 seconds east 49.18 feet to a point N161246.53, E677103.75, thence running south 55 degrees, 46 minutes, 20.8 seconds west 244.81 feet to the point of origin. (B) Redesignation.—The portion of the project for navigation, Patchogue River, Connecticut, referred to in subparagraph (A), which is now part of the 8-foot deep anchorage lying northwesterly of a line whose coordinates are N161067.46, E676982.76 and N161173.63, E677138.81, is redesignated as part of the 8-foot deep channel. The perimeter of this area starts at a point with coordinates N161067.46, E676982.76, thence running north 7 degrees, 48 minutes, 40.7 seconds west 5.59 feet to a point N161073.00, E676982.00, thence running north 55 degrees, 46 minutes, 25.1 seconds east 177.79 feet to a point N161173.00, E677129.00, thence running north 86 degrees, 19 minutes, 31.8 seconds east 9.83 feet to a point N161173.63, E677138.81, thence running south 55 degrees, 46 minutes, 12.9 seconds west 188.74 feet to the point of origin. (7) Southport harbor, connecticut.—(A) In general.—The following portions of the project for navigation, Southport Harbor, Connecticut, authorized by the 1st section of the Act entitled “An Act authorizing the construction, repair, and preservation of certain public works on rivers and harbors, and for other purposes”, approved August 30, 1935 (49 Stat. 1029): (i) The 6-foot deep anchorage located at the head of the project. (ii) The portion of the 9-foot deep channel beginning at a bend in the channel the coordinates of which are north 109131.16, east 452653.32, running thence in a northeasterly direction about 943.01 feet to a point the coordinates of which are north 109635.22, east 453450.31, running thence in a southeasterly direction about 22.66 feet to a point the coordinates110 STAT. 3734 of which are north 109617.15, east 453463.98, running thence in a southwesterly direction about 945.18 feet to the point of beginning. (B) Remainder.—The portion of the project referred to in subparagraph (A) that is remaining after the deauthorization made by subparagraph (A) and that is northerly of a line the coordinates of which are north 108699.15, east 452768.36, and north 108655.66, east 452858.73, is redesignated as an anchorage. (8) Stony creek, connecticut.—The following portion of the project for navigation, Stony Creek, Connecticut, authorized under section 107 of the River and Harbor Act of 1960 (33 U.S.C. 577), located in the 6-foot deep maneuvering basin: Beginning at coordinates N157,031.91, E599,030.79, thence running northeasterly about 221.16 feet to coordinates N157,191.06, E599,184.37, thence running northerly about 162.60 feet to coordinates N157,353.56, E599,189.99, thence running southwesterly about 358.90 feet to the point of beginning. (9) East boothbay harbor, maine.— The following portion of the navigation project for East Boothbay Harbor, Maine, authorized by the 1st section of the Act entitled “An Act making appropriations for the construction, repair, and preservation of certain public works on rivers and harbors, and for other purposes”, approved June 25, 1910 (36 Stat. 657), containing approximately 1.15 acres and described in accordance with the Maine State Coordinate System, West Zone: Beginning at a point noted as point number 6 and shown as having plan coordinates of North 9, 722, East 9, 909, on the plan entitled, “East Boothbay Harbor, Maine, examination, 8-foot area”, and dated August 9, 1955, Drawing Number F1251 D–6–2, that point having Maine State Coordinate System, West Zone coordinates of Northing 74514, Easting 698381. Thence, North 58 degrees, 12 minutes, 30 seconds East a distance of 120.9 feet to a point. Thence, South 72 degrees, 21 minutes, 50 seconds East a distance of 106.2 feet to a point. Thence, South 32 degrees, 04 minutes, 55 seconds East a distance of 218.9 feet to a point. Thence, South 61 degrees, 29 minutes, 40 seconds West a distance of 148.9 feet to a point. Thence, North 35 degrees, 14 minutes, 12 seconds West a distance of 87.5 feet to a point. Thence, North 78 degrees, 30 minutes, 58 seconds West a distance of 68.4 feet to a point. Thence, North 27 degrees, 11 minutes, 39 seconds West a distance of 157.3 feet to the point of beginning. (10) Kennebunk river, maine.—The portion of the project for navigation, Kennebunk River, Maine, authorized by section 101 of the River and Harbor Act of 1962 (76 Stat. 1173) and consisting of a 6-foot deep channel that lies northerly of a line the coordinates of which are N191412.53, E417265.28 and N191445.83, E417332.48. (11) York harbor, maine.—The following portions of the project for navigation, York Harbor, Maine, authorized by section 101 of the River and Harbor Act of 1960 (74 Stat. 480): 110 STAT. 3735 (A) The portion located in the 8-foot deep anchorage area beginning at coordinates N109340.19, E372066.93, thence running north 65 degrees, 12 minutes, 10.5 seconds east 423.27 feet to a point N109517.71, E372451.17, thence running north 28 degrees, 42 minutes, 58.3 seconds west 11.68 feet to a point N109527.95, E372445.56, thence running south 63 degrees, 37 minutes, 24.6 seconds west 422.63 feet to the point of beginning. (B) The portion located in the 8-foot deep anchorage area beginning at coordinates N108557.24, E371645.88, thence running south 60 degrees, 41 minutes, 17.2 seconds east 484.51 feet to a point N108320.04, E372068.36, thence running north 29 degrees, 12 minutes, 53.3 seconds east 15.28 feet to a point N108333.38, E372075.82, thence running north 62 degrees, 29 minutes, 42.1 seconds west 484.73 feet to the point of beginning. (12) Chelsea river, boston harbor, massachusetts.—The following portion of the project for navigation, Boston Harbor, Massachusetts, authorized by section 101 of the River and Harbor Act of 1962 (76 Stat. 1173), consisting of a 35-foot deep channel in the Chelsea River: Beginning at a point on the northern limit of the existing project N505357.84, E724519.19, thence running northeasterly about 384.19 feet along the northern limit of the existing project to a bend on the northern limit of the existing project N505526.87, E724864.20, thence running southeasterly about 368.00 feet along the northern limit of the existing project to another point N505404.77, E725211.35, thence running westerly about 594.53 feet to a point N505376.12, E724617.51, thence running southwesterly about 100.00 feet to the point of origin. (13) Cohasset harbor, massachusetts.—The following portions of the project for navigation, Cohasset Harbor, Massachusetts, authorized by section 2 of the Act entitled “An Act authorizing the construction, repair, and preservation of certain public works on rivers and harbors, and for other purposes”, approved March 2, 1945 (59 Stat. 12), and authorized pursuant to section 107 of the River and Harbor Act of 1960 (33 U.S.C. 577): A 7-foot deep anchorage and a 6-foot deep anchorage; beginning at site 1, beginning at a point N453510.15, E792664.63, thence running south 53 degrees 07 minutes 05.4 seconds west 307.00 feet to a point N453325.90, E792419.07, thence running north 57 degrees 56 minutes 36.8 seconds west 201.00 feet to a point N453432.58, E792248.72, thence running south 88 degrees 57 minutes 25.6 seconds west 50.00 feet to a point N453431.67, E792198.73, thence running north 01 degree 02 minutes 52.3 seconds west 66.71 feet to a point N453498.37, E792197.51, thence running north 69 degrees 12 minutes 52.3 seconds east 332.32 feet to a point N453616.30, E792508.20, thence running south 55 degrees 50 minutes 24.1 seconds east 189.05 feet to the point of origin; then site 2, beginning at a point, N452886.64, E791287.83, thence running south 00 degrees 00 minutes 00.0 seconds west 56.04 feet to a point, N452830.60, E791287.83, thence running north 90 degrees 00 minutes 00.0 seconds west 101.92 feet to a point, N452830.60, E791185.91, thence running north 52 degrees 12 minutes 49.7 seconds east 89.42 feet to a point, N452885.39, E791256.58, thence running north 87 degrees 42110 STAT. 3736 minutes 33.8 seconds east 31.28 feet to the point of origin; and site 3, beginning at a point, N452261.08, E792040.24, thence running north 89 degrees 07 minutes 19.5 seconds east 118.78 feet to a point, N452262.90, E792159.01, thence running south 43 degrees 39 minutes 06.8 seconds west 40.27 feet to a point, N452233.76, E792131.21, thence running north 74 degrees 33 minutes 29.1 seconds west 94.42 feet to a point, N452258.90, E792040.20, thence running north 01 degree 03 minutes 04.3 seconds east 2.18 feet to the point of origin. (14) Falmouth, massachusetts.—(A) Deauthorizations.—The following portions of the project for navigation, Falmouth Harbor, Massachusetts, authorized by section 101 of the River and Harbor Act of 1948 (62 Stat. 1172): (i) The portion commencing at a point north 199286.37 east 844394.81 a line running north 73 degrees 09 minutes 29 seconds east 440.34 feet to a point north 199413.99 east 844816.36, thence turning and running north 43 degrees 09 minutes 34.5 seconds east 119.99 feet to a point north 199501.52 east 844898.44, thence turning and running south 66 degrees 52 minutes 03.5 seconds east 547.66 feet returning to a point north 199286.41 east 844394.91. (ii) The portion commencing at a point north 199647.41 east 845035.25 a line running north 43 degrees 09 minutes 33.1 seconds east 767.15 feet to a point north 200207.01 east 845560.00, thence turning and running north 11 degrees 04 minutes 24.3 seconds west 380.08 feet to a point north 200580.01 east 845487.00, thence turning and running north 22 degrees 05 minutes 50.8 seconds east 1332.36 feet to a point north 201814.50 east 845988.21, thence turning and running north 02 degrees 54 minutes 15.7 seconds east 15.0 feet to a point north 201829.48 east 845988.97, thence turning and running south 24 degrees 56 minutes 42.3 seconds west 1410.29 feet returning to the point north 200550.75 east 845394.18. (B) Redesignation.—The portion of the project for navigation, Falmouth, Massachusetts, referred to in subparagraph (A) upstream of a line designated by the 2 points north 199463.18 east 844496.40 and north 199350.36 east 844544.60 is redesignated as an anchorage area. (15) Mystic river, massachusetts.—The following portion of the project for navigation, Mystic River, Massachusetts, authorized by section 101 of the River and Harbor Act of 1950 (64 Stat. 164): The 35-foot deep channel beginning at a point on the northern limit of the existing project, N506243.78, E717600.27, thence running easterly about 1000.00 feet along the northern limit of the existing project to a point, N506083.42, E718587.33, thence running southerly about 40.00 feet to a point, N506043.94, E718580.91, thence running westerly about 1000.00 feet to a point, N506204.29, E717593.85, thence running northerly about 40.00 feet to the point of origin. (16) Reserved channel, boston, massachusetts.—The portion of the project for navigation, Reserved Channel, Boston,110 STAT. 3737 Massachusetts, authorized by section 101(a)(13) of the Water Resources Development Act of 1990 (104 Stat. 4607), that consists of a 40-foot deep channel beginning at a point along the southern limit of the authorized project, N489391.22, E728246.54, thence running northerly about 54 feet to a point, N489445.53, E728244.97, thence running easterly about 2,926 feet to a point, N489527.38, E731170.41, thence running southeasterly about 81 feet to a point, N489474.87, E731232.55, thence running westerly about 2,987 feet to the point of origin. (17) Weymouth-fore and town rivers, massachusetts.—The following portions of the project for navigation, Weymouth-Fore and Town Rivers, Boston Harbor, Massachusetts, authorized by section 301 of the River and Harbor Act of 1965 (79 Stat. 1089): (A) The 35-foot deep channel beginning at a bend on the southern limit of the existing project, N457394.01, E741109.74, thence running westerly about 405.25 feet to a point, N457334.64, E740708.86, thence running southwesterly about 462.60 feet to another bend in the southern limit of the existing project, N457132.00, E740293.00, thence running northeasterly about 857.74 feet along the southern limit of the existing project to the point of origin. (B) The 15- and 35-foot deep channels beginning at a point on the southern limit of the existing project, N457163.41, E739903.49, thence running northerly about 111.99 feet to a point, N457275.37, E739900.76, thence running westerly about 692.37 feet to a point N457303.40, E739208.96, thence running southwesterly about 190.01 feet to another point on the southern limit of the existing project, N457233.17, E739032.41, thence running easterly about 873.87 feet along the southern limit of the existing project to the point of origin. (18) Cocheco river, new hampshire.—(A) In general.—The portion of the project for navigation, Cocheco River, New Hampshire, authorized by the 1st section of the Act entitled “An Act making appropriations for the construction, repair, and preservation of certain public works on rivers and harbors, and for other purposes”, approved September 19, 1890 (26 Stat. 436), and consisting of a 7-foot deep channel that lies northerly of a line the coordinates of which are N255292.31, E713095.36, and N255334.51, E713138.01. (B) Maintenance dredging.—Not later than 18 months after the date of the enactment of this Act, the Secretary shall perform maintenance dredging for the remaining authorized portions of the Federal navigation channel under the project described in subparagraph (A) to restore authorized channel dimensions. (19) Morristown harbor, new york.—The portion of the project for navigation, Morristown Harbor, New York, authorized by the 1st section of the Act entitled “An Act authorizing the construction, repair, and preservation of certain public works on rivers and harbors, and for other purposes”, approved January 21, 1927 (44 Stat. 1014), that lies north of the northern boundary of Morris Street extended. (20) Oswegatchie river, ogdensburg, new york.—The portion of the Federal channel of the project for navigation,110 STAT. 3738 Ogdensburg Harbor, New York, authorized by the 1st section of the Act entitled “An Act making appropriations for the construction, repair, and preservation of certain public works on rivers and harbors, and for other purposes”, approved June 25, 1910 (36 Stat. 635), and modified by the 1st section of the Act entitled “An Act authorizing the construction, repair, and preservation of certain public works on rivers and harbors, and for other purposes”, approved August 30, 1935 (49 Stat. 1037), that is in the Oswegatchie River in Ogdensburg, New York, from the southernmost alignment of the Route 68 bridge upstream to the northernmost alignment of the Lake Street bridge. (21) Conneaut harbor, ohio.—The most southerly 300 feet of the 1,670-foot long Shore Arm of the project for navigation, Conneaut Harbor, Ohio, authorized by the 1st section of the Act entitled “An Act making appropriations for the construction, repair, and preservation of certain public works on rivers and harbors, and for other purposes”, approved June 25, 1910 (36 Stat. 653). (22) Lorain small boat basin, lake erie, ohio.— The portion of the Federal navigation channel, Lorain Small Boat Basin, Lake Erie, Ohio, authorized pursuant to section 107 of the River and Harbor Act of 1960 (33 U.S.C. 577) that is situated in the State of Ohio, County of Lorain, Township of Black River and is a part of Original Black River Township Lot Number 1, Tract Number 1, further known as being submerged lands of Lake Erie owned by the State of Ohio, and that is more definitely described as follows: Commencing at a drill hole found on the centerline of Lakeside Avenue (60 feet in width) at the intersection of the centerline of the East Shorearm of Lorain Harbor, that point being known as United States Corps of Engineers Monument No. 203 (N658012.20, E208953.88). Thence, in a line north 75 degrees 26 minutes 12 seconds west, a distance of 387.87 feet to a point (N658109.73, E2089163.47). This point is hereinafter in this paragraph referred to as the “principal point of beginning”. Thence, north 58 degrees 14 minutes 11 seconds west, a distance of 50.00 feet to a point (N658136.05, E2089120.96). Thence, south 67 degrees 49 minutes 32 seconds west, a distance of 665.16 feet to a point (N657885.00, E2088505.00). Thence, north 88 degrees 13 minutes 52 seconds west, a distance of 551.38 feet to a point (N657902.02, E2087953.88). Thence, north 29 degrees 17 minutes 42 seconds east, a distance of 114.18 feet to a point (N658001.60, E2088009.75). Thence, south 88 degrees 11 minutes 40 seconds east, a distance of 477.00 feet to a point (N657986.57, E2088486.51). Thence, north 68 degrees 11 minutes 06 seconds east, a distance of 601.95 feet to a point (N658210.26, E2089045.35). 110 STAT. 3739 Thence, north 35 degrees 11 minutes 34 seconds east, a distance of 89.58 feet to a point (N658283.47, E2089096.98). Thence, south 20 degrees 56 minutes 30 seconds east, a distance of 186.03 feet to the principal point of beginning (N658109.73, E2089163.47) and containing within such bounds 2.81 acres, more or less, of submerged land. (23) Apponaug cove, rhode island.—The following portion of the project for navigation, Apponaug Cove, Rhode Island, authorized by section 101 of the River and Harbor Act of 1960 (74 Stat. 480), consisting of the 6-foot deep channel: Beginning at a point, N223269.93, E513089.12, thence running northwesterly to a point N223348.31, E512799.54, thence running southwesterly to a point N223251.78, E512773.41, thence running southeasterly to a point N223178.00, E513046.00, thence running northeasterly to the point of beginning. (24) Port Washington harbor, wisconsin.—The following portion of the navigation project for Port Washington Harbor, Wisconsin, authorized by the 1st section of the Act entitled “An Act making appropriations for the repair, preservation, and completion of certain public works on rivers and harbors, and for other purposes, for the fiscal year ending June thirtieth, eighteen hundred and seventy-one”, approved July 11, 1870 (16 Stat. 223): Beginning at the northwest corner of the project at Channel Pt. No. 36, of the Federal Navigation Project, Port Washington Harbor, Ozaukee County, Wisconsin, at coordinates N513529.68, E2535215.64, thence 188 degrees 31 minutes 59 seconds, a distance of 178.32 feet, thence 196 degrees 47 minutes 17 seconds, a distance of 574.80 feet, thence 270 degrees 58 minutes 25 seconds, a distance of 465.50 feet, thence 178 degrees 56 minutes 17 seconds, a distance of 130.05 feet, thence 87 degrees 17 minutes 05 seconds, a distance of 510.22 feet, thence 104 degrees 58 minutes 31 seconds, a distance of 178.33 feet, thence 115 degrees 47 minutes 55 seconds, a distance of 244.15 feet, thence 25 degrees 12 minutes 08 seconds, a distance of 310.00 feet, thence 294 degrees 46 minutes 50 seconds, a distance of 390.20 feet, thence 16 degrees 56 minutes 16 seconds, a distance of 570.90 feet, thence 266 degrees 01 minutes 25 seconds, a distance of 190.78 feet to Channel Pt. No. 36, the point of beginning.
Pub. L. 104-303, tit. III, sec. 364: PROJECT DEAUTHORIZATIONS. | Justis AI