Pub. L. 100-17, tit. I, sec. 103
APPROVAL OF COST ESTIMATE AND AUTHORIZATION OF APPROPRIATIONS FOR INTERSTATE SUBSTITUTE PROJECTS.
SEC. 103. APPROVAL OF COST ESTIMATE AND AUTHORIZATION OF APPROPRIATIONS FOR INTERSTATE SUBSTITUTE PROJECTS. (a) Fiscal Year 1987.— The Secretary shall apportion for fiscal year 1987 the sums to be apportioned for such year under section 103(e)(4) of title 23, United States Code, for expenditure on substitute highway and transit projects, using the apportionment factors contained in the Committee Print Numbered 100–6 of the Committee on Public Works and Transportation of the House of Representatives. (b) Authorization of Appropriations; Period of Availability of Apportioned Funds; Extension of Substitute ICE Approval Process.—Section 103(e)(4) of title 23, United States Code, is amended to read as follows: “(4) Interstate substitute program.— “(A) Withdrawal of approval.—Upon the joint request of a State Governor and the local governments concerned, the Secretary may withdraw approval of any route or portion thereof on the Interstate System which was selected and approved in accordance with this title, if the Secretary determines that such route or portion thereof is not essential to completion of a unified and connected Interstate System and if the Secretary receives assurances that the State does not intend to construct a toll road in the traffic corridor which would be served by the route or portion thereof. “(B) Substitute projects.—When the Secretary withdraws approval under this paragraph, a sum equal to the Federal share of the cost to complete the withdrawn route or portion thereof, as that cost is included in the latest Interstate System cost estimate approved by Congress, or up to and including the 1983 interstate cost estimate, whichever is earlier, subject to increase or decrease, as determined by the Secretary based on changes in construction costs of the withdrawn route or portion thereof as of the date of approval of each substitute project under this paragraph, or the date of approval of the 1983 interstate cost estimate, whichever is earlier, shall be available to the Secretary to incur obligations for the Federal share of either public mass transit projects involving the construction of fixed rail facilities or the purchase of passenger equipment including rolling stock, for any mode of mass transit, or both, or highway construction projects on any public road, or both, which will serve the area or areas from which the interstate route or portion thereof was with-101 STAT. 137drawn, which are selected by the responsible local officials of the area or areas to be served, and which are selected by the Governor or the Governors of the State or the States in which the withdrawn route was located if the withdrawn route was not within an urbanized area or did not pass through and connect urbanized areas, and which are submitted by the Governors of the States in which the withdrawn route was located. Each project constructed under this paragraph on a Federal-aid system shall be subject to the provisions of this title applicable to such system. Each project constructed under this paragraph not on a Federal-aid system shall be subject to the provisions of this title applicable to projects on the Federal-aid secondary system. “(C) Deadline for withdrawal.—The Secretary shall not approve any withdrawal of a route under this paragraph after September 30, 1983— “(i) except that with respect to any route which on November 6, 1978, is under judicial injunction prohibiting its construction the Secretary may approve withdrawals until September 30, 1986, and “(ii) except that with respect to any route which on May 12, 1982, is under judicial injunction prohibiting its construction, the Secretary may approve withdrawals on such route until September 30, 1985. “(D) Project approval; federal share.—Approval by the Secretary of the plans, specifications, and estimates for a substitute project shall be deemed to be a contractual obligation of the Federal Government. The Federal share of each substitute project shall not exceed 85 percent of the cost thereof. “(E) Availability of funds for substitute projects.— “(i) Time period.—The sums apportioned and the sums allocated under this paragraph for public mass transit projects and for highway construction projects in a State shall remain available for obligation in such State for the fiscal year for which apportioned or allocated, as the case may be, and for the succeeding fiscal year. “(ii) Reapportionment or reallocation.—Any sums which are apportioned or allocated to a State and are unobligated (other than an amount which, by itself, is insufficient to pay the Federal share of the cost of a substitute project which has been submitted by the State to the Secretary for approval) at the end of the period of availability established by clause (i) shall be apportioned or allocated, as the case may be, among those States which have obligated all sums (other than such an amount) apportioned or allocated, as the case may be, to them. Such reapportionments shall be in accordance with the latest approved or adjusted estimate of the cost of completing substitute projects, and such reallocations shall be at the discretion of the Secretary. “(F) Administration of transit funds.—The sums obligated for mass transit projects under this paragraph shall 101 STAT. 138become part of, and be administered through, the Urban Mass Transportation Fund. “(G) Authorization of appropriations for highway projects.—For the fiscal year ending September 30, 1983, $257,000,000 shall be available out of the Highway Trust Fund for expenditure at the discretion of the Secretary for projects under highway assistance programs. There shall be available, out of the Highway Trust Fund (other than the Mass Transit Account), to the Secretary for expenditure under this paragraph for projects under highway assistance programs $700,000,000 per fiscal year for each of fiscal years 1984 and 1985, $693,825,000 for fiscal year 1986, and $740,000,000 per fiscal year for each of fiscal years 1987, 1988, 1989, 1990, and 1991. “(H) Distribution of substitute highway funds.— “(i) Between discretionary and apportioned programs.—Subject to section 149(d) of the Federal-Aid Highway Act of 1987, 25 percent of the funds made available by subparagraph (G) for each of fiscal years 1984, 1985, 1986, 1987, 1988, 1989, 1990, and 1991 for substitute highway projects under this paragraph shall be distributed at the discretion of the Secretary. The remaining 75 percent of such funds shall be apportioned in accordance with cost estimates approved by Congress or adjusted by the Secretary. “(ii) Fiscal years 1985, 1986, and 1987 apportionments.—The Secretary shall make a revised estimate of the cost of completing substitute highway projects under this paragraph and transmit the same to the Senate and the House of Representatives within 10 days subsequent to January 2, 1984, and upon approval by Congress, the Secretary shall use the Federal share of such approved estimate in making apportionments for substitute highway projects for fiscal years 1985, 1986, and 1987. “(iii) Fiscal years 1988, 1989, 1990, and 1991 apportionments.—The Secretary shall make a revised estimate of the cost of completing substitute highway projects under this paragraph and transmit the same to the Senate and the House of Representatives as soon as practicable after the date of the enactment of the Federal-Aid Highway Act of 1987. Upon approval by Congress, the Secretary shall use the Federal share of such approved estimate in making apportionments for substitute highway projects for fiscal year 1988. If such estimate is not approved by Congress by September 30, 1987, the Secretary shall adjust such estimate in accordance with this clause and use the Federal share of the adjusted estimate in making apportionments for fiscal year 1988. The Secretary shall adjust such estimate annually thereafter in accordance with this clause and shall use the Federal share of such adjusted estimate in making apportionments for substitute highway projects for fiscal years 1989, 1990, and 1991. The adjustments required by this clause shall reflect previous withdrawals of interstate segments, changes in State estimates in the division of funds between sub-101 STAT. 139stitute highway and transit projects, amounts made available in prior fiscal years, and the availability and reapportionment of funds under subparagraph (E). “(I) Authorization of appropriations for transit projects.—There are authorized to be appropriated for liquidation of obligations incurred for substitute transit projects under this paragraph the sums provided in section 4(g) of the Urban Mass Transportation Act of 1964. “(J) Distribution of substitute transit funds.— “(i) Between discretionary and apportioned programs.—Fifty percent of the funds appropriated for each fiscal year beginning after September 30, 1983, for carrying out substitute transit projects under this paragraph shall be distributed at the discretion of the Secretary. The remaining 50 percent of such funds shall be apportioned in accordance with cost estimates approved by Congress or adjusted by the Secretary. “(ii) Fiscal years 1985, 1986, and 1987 apportionments.—The Secretary shall make a revised estimate of the cost of completing substitute transit projects under this paragraph and transmit the same to the Senate and the House of Representatives within 10 days subsequent to January 2, 1984, and upon approval by Congress, the Secretary shall use the Federal share of such approved estimate in making apportionments for substitute transit projects for fiscal years 1985, 1986, and 1987. “(iii) Fiscal years 1988, 1989, 1990, and 1991 apportionments.—The Secretary shall make a revised estimate of the cost of completing substitute transit projects under this paragraph and transmit the same to the Senate and the House of Representatives as soon as practicable after the date of the enactment of the Federal-Aid Highway Act of 1987. Upon approval by Congress, the Secretary shall use the Federal share of such approved estimate in making apportionments for substitute transit projects for fiscal year 1988. If such estimate is not approved by Congress by September 30, 1987, the Secretary shall adjust such estimate in accordance with this clause and use the Federal share of the adjusted estimate in making apportionments for fiscal year 1988. The Secretary shall adjust such estimate annually thereafter in accordance with this clause and shall use the Federal share of such adjusted estimate in making apportionments for substitute transit projects for fiscal years 1989, 1990, and 1991. The adjustments required by this clause shall reflect previous withdrawals of Interstate segments, changes in State estimates in the division of funds between substitute highway and transit projects, amounts made available in prior fiscal years, and the availability and reapportionment of funds under subparagraph (E). “(K) Reduction of interstate apportionment.— “(i) In general.—Unobligated apportionments for the Interstate System in any State where a withdrawal is approved under this paragraph shall, on the date of such approval, be reduced in the proportion that the 101 STAT. 140Federal share of the cost of the withdrawn route or portion thereof bears to the Federal share of the total cost of all interstate routes in that State as reflected in the latest cost estimate approved by the Congress. “(ii) Exception.—In any State where the withdrawal of an interstate route or portion thereof has been approved under this section prior to the date of the enactment of the Federal-Aid Highway Act of 1976, the unobligated apportionments for the Interstate System in that State on such date of enactment shall be reduced in the proportion that the Federal share of the cost to complete such route or portion thereof, as shown in the latest cost estimate approved by Congress prior to such approval of withdrawal, bears to the Federal share of the cost of all interstate routes in that State, as shown in such cost estimate; except that the amount of such proportional reduction shall be credited with the amount of any reduction in such State’s Interstate apportionment which was attributable to the Federal share of any substitute project approved under this paragraph before such date of enactment. “(L) Applicability of umta.— “(i) Supplementary funds.—Funds available for expenditure to carry out the purposes of this paragraph shall be supplementary to and not in substitution for funds authorized and available for obligation pursuant to the Urban Mass Transportation Act of 1964. “(ii) Labor protection.—The provisions of section 3(e)(4) of the Urban Mass Transportation Act of 1964 shall apply in carrying out this paragraph. “(M) Limitation on interstate designations.—After the date of the enactment of the Federal-Aid Highway Act of 1978, the Secretary may not designate any mileage as part of the Interstate System pursuant to this paragraph or under any other provision of law. The preceding sentence shall not apply to a designation made under section 139 of this title. “(N) Open to traffic requirement.—After September 30, 1979, the Secretary shall not withdraw his approval under this paragraph of any route or portion thereof on the Interstate System open to traffic before the date of the proposed withdrawal. Any withdrawal of approval of any such route or portion thereof before September 30, 1979, is hereby determined to be authorized by this paragraph. “(O) Limitation on substitution for statutorily designated routes.—Any route or segment which was statutorily designated after March 7, 1978, to be on the Interstate System shall not be eligible for withdrawal or substitution under this subsection. “(P) Right-of-way payback.— “(i) Enforcement.—Of sums apportioned or allocated under this paragraph to a State, the Secretary shall not obligate for projects in such State an amount equal to the amount of Federal funds expended to purchase the right-of-way for any withdrawn route or portion thereof if the right-of-way is not first disposed 101 STAT. 141of (or applied to a project in accordance with paragraph (5) (B), (6)(B), or (7)) by the State. “(ii) Limitation on applicability.—Clause (i) shall not apply to sums apportioned or allocated under this paragraph to a State for a fiscal year if the projected total amount of funds to be apportioned and allocated under this paragraph to such State in succeeding fiscal years exceeds the amount of Federal funds expended to purchase the right-of-way. “(iii) Release of funds.—The Secretary may obligate for projects in a State under this paragraph any funds withheld from obligation in such State if the State repays an equivalent amount in accordance with paragraph (5)(B), (6)(B), or (7), as the case may be, or if the Secretary determines that such repayment is not required under such paragraph.”. (c) Substitute Transit Projects.— (1) Increase in cost to complete.—The cost of completing substitute transit projects under section 103(e)(4)(B) of title 23, United States Code, is increased by $100,000,000. (2) Apportionment factors.—Notwithstanding section 103(e)(4) of such title, funds appropriated to carry out projects as a result of enactment of paragraph (1) shall be made available in accordance with the apportionment factors contained in the Committee Print Numbered 100–2 of the Committee on Public Works and Transportation of the House of Representatives. (d) Contract Deadline for Substitute Projects.— (1) Elimination.—Subsection (e) of section 107 of the Federal-Aid Highway Act of 1978 (23 U.S.C. 103 note) is amended— (A) in the first sentence by striking out “and all Interstate substitute projects pursuant to subsection (e)(4) of section 103 of title 23, United States Code (for which the Secretary finds that sufficient Federal funds are available)”; and (B) in the second sentence by striking out “and in the case” and all that follows through the period at the end of such subsection and inserting in lieu thereof a period. (2) Effective date.—The amendments made by paragraph (1) shall take effect September 29, 1986. (e) Inclusion of Certain Costs as Non-Federal Share.—If the State of Oregon completes construction of a segment of an east-west highway which segment connects 158th Avenue and Cornelius Pass Road in Washington County, Oregon, with funds made available under section 103(e)(4) of title 23, United States Code, the Secretary shall include as part of the non-Federal share of the cost of construction of such segment all funds expended by private land developers after January 1, 1980, on construction of such segment. (f) Conforming Amendments.—(1) Section 103(e) of title 23, United States Code, is amended— (A) by inserting “Interstate System.—” before “(1) The Interstate”; (B) in paragraph (1) by inserting “Designation; mileage limitation.—” before “The Interstate”; (C) in paragraph (2) by inserting “Modifications.—” before “In addition”; (D) in paragraph (3) by inserting “Additional mileage for improved efficiency.—” before “In addition”; 101 STAT. 142 (E) in paragraph (5) by inserting “Limitation on refunds for withdrawals before November 6, 1978.—” before “Notwithstanding” and by striking out “; and” at the end of such paragraph and inserting in lieu thereof a period; (F) in paragraph (6) by inserting “Limitation on refunds for withdrawals on and after November 6, 1978.—” before “Notwithstanding” and by striking out the semicolon at the end of such paragraph and inserting in lieu thereof a period; (G) in paragraph (7) by inserting “Additional limitation on refunds.—” before “In any” and by striking out “; and” at the end of such paragraph and inserting in lieu thereof a period; (H) in paragraph (8) by inserting “Protection of property rights.—” before “Nothing”; (I) in paragraph (9) by inserting “Limitation on funding of modified mileage projects.—” before “Interstate mileage”; (J) by indenting paragraph (1) and aligning such paragraph and paragraphs (2), (3), (5), (6), (7), (8), and (9) with paragraph (4) of such section, as amended by subsection (b) of this section; and (K) by aligning subparagraphs (A) and (B) of paragraphs (5) and (6) with subparagraph (A) of such paragraph (4). (2) Section 107(c)(2) of the Highway Improvement Act of 1982 (23 U.S.C. 103 note) is amended— (A) by striking out “the second sentence” and inserting in lieu thereof “subparagraph (B)”; and (B) by striking out “such sentence” and inserting in lieu thereof “such subparagraph”.