Pub. L. 105-85, div. A, tit. III, subtit. F, sec. 384
STUDY AND NOTIFICATION REQUIREMENTS FOR CONVERSION OF COMMERCIAL AND INDUSTRIAL TYPE FUNCTIONS TO CONTRACTOR PERFORMANCE.
SEC. 384. STUDY AND NOTIFICATION REQUIREMENTS FOR CONVERSION OF COMMERCIAL AND INDUSTRIAL TYPE FUNCTIONS TO CONTRACTOR PERFORMANCE. (a) Additional Notification Requirement.—Subsection (a)(1) of section 2461 of title 10, United States Code, is amended by inserting before the semicolon the following: “and the anticipated length and cost of the study”. (b) Notification of Conversion Decision.—Subsection (b) of such section is amended by adding at the end the following new sentence: “The notification shall include the timetable for completing conversion of the function to contractor performance.”. (c) Waiver for Small Functions.—Subsection (d) of such section is amended by striking out “45 or fewer” and inserting in lieu thereof “20 or fewer”.111 STAT. 1712