Pub. L. 106-541, tit. IV, sec. 425

CHICAGO, ILLINOIS.

EnactedYear: 2000Length: 84 wordsOfficial source
SEC. 425. CHICAGO, ILLINOIS. (a) In General.—The Secretary shall conduct a study to determine the feasibility of carrying out a project for shoreline protection along the Chicago River, Chicago, Illinois. (b) Sites.—Under subsection (a), the Secretary shall study— (1) the USX/South works site; (2) Calumet Lake and River; (3) the Canal Origins Heritage Corridor; and (4) Ping Tom Park. (c) Use of Information; Consultation.—In carrying out this section, the Secretary shall use available information from, and consult with, appropriate Federal, State, and local agencies.