Pub. L. 106-541, tit. IV, sec. 432

LAKE PONTCHARTRAIN SEAWALL LOUISIANA

EnactedYear: 2000Length: 83 wordsOfficial source
SEC. 432. LAKE PONTCHARTRAIN SEAWALL LOUISIANA Not later than 180 days after the date of enactment of this Act, the Secretary shall complete a post-authorization change report on the project for hurricane-flood protection, Lake Pontchartrain, Louisiana, authorized by section 204 of the Flood Control Act of 1965 (79 Stat. 1077), to include structural modifications to the seawall providing protection along the south shore of Lake Pontchartrain from the New Basin Canal on the west to the Inner Harbor Navigation Canal on the east.