Pub. L. 106-65, div. A, tit. VIII, subtit. B, sec. 820

REPORT ON OPTIONS FOR ACCELERATED ACQUISITION OF PRECISION MUNITIONS.

EnactedYear: 1999Length: 450 wordsOfficial source
SEC. 820. REPORT ON OPTIONS FOR ACCELERATED ACQUISITION OF PRECISION MUNITIONS. (a) Findings.—Congress finds the following: (1) Current Department of Defense inventories of many types of precision munitions do not meet the requirements for such munitions under the National Military Strategy that the Department of Defense have the capability to conduct two nearly simultaneous Major Theater Wars, and with respect to some types of precision munitions, those requirements will not be met even after planned acquisitions are complete. (2) Production lines for certain types of critical precision munitions have been shut down, and the start-up production of replacement precision munitions leaves a critical gap in acquisition of follow-on precision munitions. (3) Shortages of conventional air-launched cruise missiles during Operation Allied Force (conducted against the Federal Republic of Yugoslavia in the spring of 1999) and the necessity to replenish inventories of land-attack Tomahawk cruise missiles following that operation indicate the critical need to maintain sufficient inventories of precision munitions. (b) Report.—Not later than February 15, 2000, the Secretary of Defense shall submit to the congressional defense committees a report on the requirements of the Department of Defense for precision munitions under the National Military Strategy that the Department of Defense have the capability to conduct two nearly simultaneous Major Theater Wars. The report shall include the following: (1) The effect of recent conflicts on the shift to precision munitions of targets previously allocated to nonprecision munitions in the inventory requirements process.113 STAT. 714 (2) The required inventories of precision munitions, by type, including existing or planned munitions or such munitions with appropriate upgrades, to meet the requirement that the Department of Defense have the capability to conduct two nearly simultaneous Major Theater Wars. (3) Current inventories of those precision munitions. (4) The year when required inventories for each of those types of precision munitions will be achieved within the acquisition plans set forth in the budget of the President for fiscal year 2001. (5) The year those inventories would be achieved within existing or planned production capacity if produced at— (A) the minimum sustained production rate; (B) the most economic production rate; and (C) the maximum production rate. (6) The required level of funding to support production for each of those types of munitions at each of the production rates specified in paragraph (5), compared to the funding programmed for each type of munition in the future-years defense program using the acquisition plans specified in paragraph (4). (7) With respect to each existing or planned munitions for which the inventory is not expected to meet the two Major Theater War requirement by October 1, 2005, the Secretary’s assessment of the risk associated with not having met such requirement by that date.
Pub. L. 106-65, div. A, tit. VIII, subtit. B, sec. 820: REPORT ON OPTIONS FOR ACCELERATED ACQUISITION OF PRECISION MUNITIONS. | Justis AI