Pub. L. 106-65, div. C, tit. XXXI, subtit. F, sec. 3177

PROPOSED SCHEDULE FOR SHIPMENTS OF WASTE FROM ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE, COLORADO, TO WASTE ISOLATION PILOT PLANT, NEW MEXICO.

EnactedYear: 1999Length: 254 wordsOfficial source
SEC. 3177. PROPOSED SCHEDULE FOR SHIPMENTS OF WASTE FROM ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE, COLORADO, TO WASTE ISOLATION PILOT PLANT, NEW MEXICO. (a) Submittal of Proposed Schedule.—Not later than 60 days after the date of the enactment of this Act, the Secretary of Energy shall submit to the Committee on Armed Services of the Senate and the Committee on Armed Services and the Committee on Commerce of the House of Representatives a proposed schedule for shipment of mixed and unmixed transuranic waste from the Rocky Flats Environmental Technology Site, Colorado, to the Waste Isolation Pilot Plant, New Mexico. The proposed schedule shall identify a schedule for certifying, producing, and delivering appropriate shipping containers. (b) Requirements Regarding Schedule.—In preparing the schedule required under subsection (a), the Secretary shall assume the following:113 STAT. 952 (1) That the Rocky Flats Environmental Technology Site will have a closure date that is in 2006. (2) That all waste that is transferable from the Rocky Flats Environmental Technology Site to the Waste Isolation Pilot Plant will be removed from the Rocky Flats Environmental Technology Site by that closure date as specified in the current 2006 Rocky Flats Environmental Technology Site Closure Plan. (3) That, to the maximum extent practicable, shipments of waste from the Rocky Flats Environmental Technology Site to the Waste Isolation Pilot Plant will be carried out on an expedited schedule, but not interfere with other shipments of waste to the Waste Isolation Pilot Plant that are planned as of the date of the enactment of this Act.
Pub. L. 106-65, div. C, tit. XXXI, subtit. F, sec. 3177: PROPOSED SCHEDULE FOR SHIPMENTS OF WASTE FROM ROCKY FLATS ENVIRONMENTAL TECHNOLOGY SITE, COLORADO, TO WASTE ISOLATION PILOT PLANT, NEW MEXICO. | Justis AI