Pub. L. 107-107, div. B, tit. XXVIII, subtit. D, pt. III, sec. 2854

CONVEYANCE OF SEGMENT OF LORING PETROLEUM PIPELINE, MAINE, AND RELATED EASEMENTS.

EnactedYear: 2001Length: 345 wordsOfficial source
SEC. 2854. CONVEYANCE OF SEGMENT OF LORING PETROLEUM PIPELINE, MAINE, AND RELATED EASEMENTS. (a) Conveyance Authorized.—The Secretary of the Air Force may convey, without consideration, to the Loring Development Authority, Maine (in this section referred to as the “Authority”), all right, title, and interest of the United States in and to the segment of the Loring Petroleum (POL) Pipeline, Maine, consisting of approximately 27 miles in length and running between the Searsport terminal and Bangor Air National Guard Base. (b) Related Easements.—As part of the conveyance authorized by subsection (a), the Secretary may convey to the Authority, without consideration, all right, title, and interest of the United States in and to any easements or rights-of-way necessary for the operation or maintenance of the segment of pipeline conveyed under that subsection. (c) Reimbursement for Costs of Conveyance.—(1) The Authority shall reimburse the Secretary for the excess costs incurred by the Secretary for any environmental assessment, study, or analysis, or for any other excess costs incurred by the Secretary, in connection with the conveyance authorized by this section, if the excess costs were incurred as a result of a request by the Authority. In this paragraph, the term “excess costs” means costs in excess of those costs considered reasonable and necessary by the Secretary to comply with existing law to make the conveyance authorized by subsection (a). (2) Section 2695(c) of title 10, United States Code, shall apply to any amount received by the Secretary under this subsection. (d) Description of Property.—The exact acreage and legal description of the segment of pipeline conveyed under subsection (a), and of any easements or rights-of-way conveyed under subsection (b), shall be determined by surveys and other means satisfactory to the Secretary. The cost of any survey or other services performed at the direction of the Secretary under the preceding sentence shall be borne by the Authority. (e) Additional Terms and Conditions.—The Secretary may require such additional terms and conditions in connection with the conveyances under this section as the Secretary considers appropriate to protect the interests of the United States.
Pub. L. 107-107, div. B, tit. XXVIII, subtit. D, pt. III, sec. 2854: CONVEYANCE OF SEGMENT OF LORING PETROLEUM PIPELINE, MAINE, AND RELATED EASEMENTS. | Justis AI