Pub. L. 107-66, tit. I, sec. 111
Pub. L. 107-66, tit. I, sec. 111
Sec. 111. The Secretary of the Army, acting through the Chief of Engineers, is directed to modify the pump station intake structure and discharge line to preclude ice from interfering with pump operations at Fort Fairfield, Maine, flood control project: Provided,That all design and construction costs associated with the modifications of the Fort Fairfield, Maine, project shall be at Federal expense.